Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 13, 2026 at 7:00 PM
Updated January 14, 2026
Site work and paving for a road / highway in Flagstaff, Arizona. Completed plans call for site work for a road / highway; and for paving for a road / highway.
040 CN 040-A-(235)T (West of Williams ER) The proposed project is located in Coconino County along Interstate 40 at approximately milepost 159.2, near Williams. The work includes removing the existing Portland cement concrete pavement and installing new Portland cement concrete pavement. The work also includes removing existing asphaltic concrete on the shoulders and installing new asphaltic concrete, guardrail, signing, pavement marking, rumble strip, seeding and other related work. NorthCent District Engineering Specialist: Jakob Rassi Pre-qualification: Yes Question Deadline 01/06/2026 The Department May Not Answer All Questions, and Any Decision on Whether a Question is Answered Will Be Within the Sole Discretion of the Department. Any Questions Received Less Than Three Working Days Prior to The Bid Opening Date May Not Be Answered. The time allowed for the completion of the work included in this contract will be 70 working days. The Application for Contractor Prequalification may be obtained from the Contracts and Specifications website. A proposal guaranty in the form of either a certified or a cashier's check made payable to the State Treasurer of Arizona for not less than 10 percent of the amount of the bid or in the form of a surety (bid) bond for 10 percent of the amount of the bid shall accompany the proposal. AZDOT - System Preservation (Engineering) - Interstate 40 Addendum #1-#4 have been issued as of 1-7-2026
Bid Results
Roads / Highways
$874,849.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 9, 2026
February 9, 2026
I-40, Flagstaff, AZ
Related To This Project
Flagstaff, AZ
Bid Date: Nov 06 2025
Flagstaff, AZ
Bid Date: Nov 17 2025
Flagstaff, AZ
Bid Date: Dec 05 2025
Flagstaff, AZ
--
Flagstaff, AZ
Bid Date: Oct 24 2025
Flagstaff, AZ
Bid Date: Dec 11 2025
Flagstaff, AZ
Bid Date: Nov 21 2025
Flagstaff, AZ
Bid Date: Oct 15 2025
Flagstaff, AZ
Bid Date: Oct 15 2025
Flagstaff, AZ
Bid Date: Oct 20 2025
Flagstaff, AZ
Bid Date: Sep 18 2025
Flagstaff, AZ
Bid Date: Sep 16 2025
Flagstaff, AZ
--
Flagstaff, AZ
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
