Published October 7, 2025 at 8:00 PM
Updated October 8, 2025
Site work and new construction of a civil project in Dyer, Indiana. Completed plans call for site work for a water / sewer project; and for the construction of a water / sewer project.
As of October 7, 2025, project is awarded to Dyer Construction but the amount is not available. Site Address: 2316 Rolling Hill Drive This project generally consists of the construction of new pumping station, pump controls, electrical improvements, site grading, excavation, storm sewers and landscape restoration. Direct questions to Mr. John P. Caruso, at (847) 823-0500. Question Deadline 09/12/2025 DESCRIPTION OF WORK A. General. The Work to be performed consists of furnishing labor, materials, equipment, and supervision as required by the Contract Documents for the Sandy Ridge Park Storm Water Improvements as required and as herein specified, including any and all accessories associated with the installation. The Contractor shall submit a staged construction schedule to Owner. The Work to be performed is generally summarized to include but not be limited to the following. B. The project consists of the construction of new pumping station, pump controls, electrical improvements, site grading, excavation, storm sewers and landscape restoration at the existing Sandy Ridge Park. C. Debris Removal. Included as part of the above Work shall be the removal of any and all debris resulting from the Work including but not limited to existing pumps, flap gates, miscellaneous metals and electrical. Such debris shall be legally and properly disposed off site. All fees for such disposal shall be the responsibility of the Contractor. Contractor shall clean all pavement areas of dirt, mud and debris at the end of each work day (see Section 01 74 00). D. Painting. Paint shall be that of nationally recognized manufacturer and suitable for the application. A minimum of two coats are required unless otherwise required by paint manufacturer. Owner to select final color of paint
Award
Water / Sewer
$700,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 24, 2025
October 24, 2025
2316 Rolling Hill Dr, Dyer, IN
Related To This Project
Dyer, IN
Bid Date: Feb 03 2026
Dyer, IN
Bid Date: Feb 27 2026
Dyer, IN
Bid Date: Mar 16 2026
Dyer, IN
Bid Date: Aug 20 2025
Dyer, IN
Bid Date: Oct 15 2025
Dyer, IN
--
Dyer, IN
Bid Date: Jun 13 2025
Dyer, IN
Bid Date: Apr 15 2025
Dyer, IN
Bid Date: Mar 19 2025
Dyer, IN
Bid Date: Mar 10 2025
Dyer, IN
Bid Date: Nov 08 2024
Dyer, IN
Bid Date: Dec 04 2024
Dyer, IN
Bid Date: May 29 2024
Dyer, IN
Bid Date: Jun 28 2022
Dyer, IN
Bid Date: Mar 10 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.