Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 23, 2026 at 7:00 PM
Updated February 7, 2026
Demolition, site work and new construction of a residential development in Reno, Nevada. Completed plans call for the demolition of a residential development; for the construction of a residential development; and for site work for a residential development.
Construction Manager at Risk for Reno Avenue Redevelopment. Question Deadline 01/22/2026 at 7:00 AM PT Project Description and Objective: The Reno Ave. project consists of five existing Housing Authority of the City of Reno (RHA) owned parcels and an alley recently approved to be abandoned. The five parcels (011-262- 02, 011-262-03, 011-262- 04, 011-262-14, and 011-262-15) are located between Reno Ave. and Taylor St. Reno, NV 89509. The combined area is approximately 1.22 acres (approximately 53,000 square feet) with a current zoning designation of MF30 for the north parcels and MF14 for the south parcels.RHA aims to demolish the existing structures and construct up to 45 units of affordable housing that best utilizes the five parcels. This redevelopment will enable RHA to increase density and add more units of housing for families with household incomes at or below 60% AMI (Area Median Income). Required services include architecture (design and project management), civil engineering, landscape architecture, structural engineering, mechanical engineering, and electrical engineering for the RHA. The project includes demolition of the existing buildings and full development of the site including new buildings, site work, landscaping, and utilities. The site will include group and individual meeting spaces, leasing office, community space, computer room, and other amenities required under the current Qualified Allocated Plan from the Nevada Housing Division.As part of project financing, RHA will pursue competitive funding at the federal, state, and local level. These funding sources include, but are not limited to, Low-Income Housing Tax Credits (LIHTC), National Housing Trust Funds (NHTF) and funds from the Nevada Attainable Housing Account (NAHA) awarded by the Nevada Housing Division (NHD), and U.S. Department of Housing and Urban Development (HUD) HOME Investment Partnerships Program (HOME) funds awarded through the Washoe County HOME Consortium. If sufficient funding is secured by August 2026, RHA will proceed with the project and anticipates receiving building permits and beginning construction by April 2027. Estimated hard cost budget for this project is $12,500,000.
Post-Bid
Residential Subdivision
$12,500,000.00
Public - City
Demolition, New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 6, 2026
April 1, 2027
420 Reno Ave, Reno, NV
Related To This Project
Reno, NV
Bid Date: Sep 09 2025
Reno, NV
Bid Date: Sep 09 2025
Reno, NV
Bid Date: Sep 26 2025
Reno, NV
Bid Date: Oct 02 2025
Reno, NV
Bid Date: Oct 16 2025
Reno, NV
Bid Date: Oct 13 2025
Reno, NV
Bid Date: Sep 25 2025
Reno, NV
Bid Date: Sep 25 2025
Reno, NV
Bid Date: Sep 25 2025
Reno, NV
Bid Date: Sep 17 2025
Reno, NV
Bid Date: Dec 11 2025
Reno, NV
Bid Date: Sep 11 2025
Reno, NV
Bid Date: Sep 10 2025
Reno, NV
Bid Date: Sep 04 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
