BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 6, 2025 at 8:00 PM

Updated October 7, 2025

Site work and paving for a mixed-use development in Utica, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The proposed work is officially known as "City of LaSalle, Malcolm, Creve Coeur & Gunn Avenue Emergency Water Main Replacement - 2025", and further described as the installation of 1527' of 6" PVC Water Main, 3 Fire Hydrants, 10 Tees, 7 Valves, 21 Water Service Line Installations, 17 Water Main Bends, 76' of Water Main Casing, 116' of Water Quality Storm Sewer, 43 SY Driveway Replacement, 480' Concrete Curb & Gutter R & R, 989 SY of Pavement Replacement, including all other work as further described in the plans and specifications for said work prepared by the City ofLaSalle. All bid proposals must be accompanied by a bid bond, certified check, bank cashier's check or bank draft payable to the City of LaSalle for Five percent (5%) of the amount of the bid as provided in the proposal. No proposals or bids will be considered unless accompanied by such bond, check or draft. Said security shall be maintained until the bid is rejected or accepted or until a performance bond is substituted therefore. 5. Not less than the prevailing rate of wages found by the City of LaSalle or the Department of Labor or determined by a court of review shall be paid to all laborers, workmen, and mechanics performing work under any contract for the proposed construction. If the prevailing wage rates are revised by the Illinois Department of Labor at any time during the term of the contract, the revised prevailing wage rates shall apply to work performed pursuant to the contract, and all contractors and subcontractors shall pay their employees in accordance with the revised prevailing wage rates. 6. The successful bidder for the construction of the improvements will be required to enter into a bond equal to 100% of the amount of the bid with sureties to be approved by the Mayor and City Council, when entering into the contract for construction of the improvements, which shall be conditioned upon the proper and faithful performance by the contractor of the work specified in accordance with the plans and specifications thereof. The City of LaSalle through the City Engineer reserves the right to defer the Award of the Contract for a period not to exceed 60 calendar days after the date bids are to be received, and to accept or reject any or all proposals and to waive technicalities.

Award

Water / Sewer

$412,747.00

Public - City

Paving, Site Work

9

7

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
431
Active Projects
224
Bidding Soon
3,304
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2025

October 13, 2025

Project location map

Multiple Locations, Utica, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.