BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 2, 2025 at 8:00 PM

Updated September 4, 2025

Site work, paving and outdoor lighting for a mixed-use development in Phoenix, Arizona. Conceptual plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This project will improve Lindsay Road from Ocotillo Road to Hunt Highway including widening to four traffic lanes, ADA upgrades, bike lanes, sidewalk, curb and gutter, street lighting, traffic signals, storm drainage, raised landscape median, wet and dry utilities, irrigation systems, site walls and other improvements. This is a federally funded project, using FHWA funds. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The estimated construction cost for this project ranges from $30 to $32 Million. Scope of Work Provide all Construction Management services for the project in accordance with the engineering design and City standards. The Construction Manager may provide the following services: Preconstruction Assistance Construction Management Lead Weekly Construction Meetings Evaluate CPM Schedules Review, evaluate, and respond to: RFI's (Request for Information) Shop Drawing Submittals Field Directives Change Orders Contractor Payment Applications Prepare RFP's (Request for Proposals) Provide Public Outreach Construction Inspection Provide inspection and special inspections necessary for code compliance Facilitate closing out the project Utility Coordination Permitting Coordination Special Inspection for Traffic Signals Material Testing and Quality Assurance MOPO Coordination Coordination with Stakeholders Oversee project for Federal Highway Administration (FHWA) funding compliance Services may also include public outreach and coordination with city and county residents and businesses Review and Confirm Contractor's Red Lines SOLICITATION QUESTIONS DUE DATE: September 10, 2025 5:00 p.m. All solicitation questions must be emailed to SOQ.Questions@chandleraz.gov City Rights. The City of Chandler reserves the right to reject any or all Statements of Qualifications, to waive any informality or irregularity in any SOQs received, and to be the sole judge of the merits of the respective SOQs received.

Conceptual

Roads / Highways

$32,000,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
29
Bidding Soon
1,228
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2026

Project location map

E Ocotillo Rd, Phoenix, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.