BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 19, 2025 at 8:00 PM

Updated September 20, 2025

Renovation of an educational facility in Phoenix, Arizona. Completed plans call for the renovation of a educational facility.

For additional information please contact Lesley Pena, Senior Buyer at 602-257-4013, Lesley.PENA@phxsch ools.org Question Deadline 09/15/2025 Should you have any questions at all about the CMAR, please submit your questions electronically in OpenGov and monitor your email for notifications of electronic responses. All questions related to this solicitation shall be in writing. Offerors Request for Qualifications PESD RFQ 25-5-30 Construction Manager at Risk (CMAR) Edison Elementary Renovation. Location: Edison Elementary School 804 N 18th St, Phoenix, AZ 85006 The school is currently occupied. Temporary relocation (onsite) and construction phasing may be needed in order to allow the rebuild/renovation of the facility. The following are anticipated dates and budgets. Pre-Construction Services Start Date: Tentatively February/March 2026 Construction Start Date: June 2026 Construction Completion: December 2026 Estimated Budget: $20 million Architect: Grace. GHC | Orcutt Winslow Architects awarded services but not limited to the following: o Innovative and exciting K-5 facility o Nourish/ Nature rooms o Reconfiguration of doors and windows o Outdoor classroom capability o Flora fauna focus o Playgrounds and playfields o Beautification of campuses Additional Scope: o HVAC and lighting system efficiency upgrades o Possible cafeteria and restroom upgrades o Possible plumbing & roofing Project GMP: The Construction Manager at some point prior to construction shall assume the risk of delivering the project through a guaranteed maximum price (GMP) contract. The CMAR shall be responsible for construction means and methods and shall be required to solicit bids from pre-qualified subcontractors to perform the work utilizing the subcontractor selection process submitted.

Post-Bid

Educational

$20,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
65
Bidding Soon
1,001
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2025

June 1, 2026

Project location map

804 N 18th St, Phoenix, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.