BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 3, 2025 at 8:00 PM

Updated October 4, 2025

Site work for a water / sewer project in Philadelphia, Pennsylvania. Completed plans call for site work for a water / sewer project.

A. In general, the work to be done under this section consists of construction activities pertaining to earthwork including clearing, grubbing, importing, excavating, filling, backfilling, compacting, and grading. B. Grading shall include all work necessary to bring the designated locations of the project area to the rough grades shown on the Drawings. C. Grading shall include all borrow excavation, transporting, placement and compaction work required to provide the necessary material volumes to complete the designed grades for the project areas as shown in the Drawings. Borrow excavation work shall be comprised of two types of excavation: 1. Common Borrow Excavation. This refers to soil material salvaged within the limit of disturbance of the project. This shall include soil that will be excavated and/or stockpiled to complete the work depicted in the Drawings. 2. Foreign Borrow Excavation. This refers to soil material required in addition to the material available from regrading operations and will come from approved sources outside the limits of the project. Project No. 20182021 Sewer Reconstruction and Relay of Water Mains in E. Dauphin St (S.r. 2012) From Amber St to Trenton Ave 7234008 E. DAUPHIN STREET (S.R. 2012) FROM AMBER STREET TO TRENTON AVENUE GAUL STREET FROM E. MONTGOMERY AVENUE TO E. SUSQUEHANNAAVENUE HEWSON STREET FROM SEPVIVA STREET TO MEMPHIS STREET E. LETTERLY STREET FROM JASPER STREET TO AMBER STREET E. DAUPHIN STREET (S.R. 2012) FROM N. FRONT STREET TO EMERALD STREET YORK STREET FROM AMBER STREET TO TRENTON AVENUE 20182021 Question Deadline 09/19/2025 In Lieu of prebid meeting, any questions should be emailed to Rosina.Depasquale@phila.gov Every interpretation made to a Seller will be in the form of a written Amendment to the Contract Documents, which, if issued, will be uploaded to the Amendment section of not later than three days prior to the date fixed for the opening of Quotes MBE 15% - 20% and WBE 10% - 15% BGFE As identified in the City of Philadelphia's Annual Disparity Assessment of Workforce Diversity, the current employment hourly goals for Journeymen is 40% minority (22% African American, 15% Hispanic, and 3% Asian) and 5% female. Apprentice is 50% minority and 5% female. You must utilize Best and Good Faith Efforts to remain in compliance with the Workforce Diversity Goals outlined above.

Bid Results

Water / Sewer

$10,715,665.00

Public - City

Site Work

99

69

2

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
877
Active Projects
444
Bidding Soon
6,290
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2025

December 1, 2025

Project location map

Multiple Locations, Philadelphia, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.