BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 3, 2025 at 8:00 PM

Updated October 11, 2025

Site work for a water / sewer project in Philadelphia, Pennsylvania. Completed plans call for site work for a water / sewer project.

In Lieu of prebid meeting, any questions should be emailed to Rosina.Depasquale@phila.gov by Friday, September 19, 2025. SEWER RECONSTRUCTION and RELAY of WATER MAINS in W. SCHILLER ST from N. 7TH ST to MARSHALL ST (Est. > $5,000,000) These Bids require Compliance with Office of Economic Opportunity. MBE - 15% - 20% ; WBE - 10% - 15% Bid 2347-41025 As identified in the City of Philadelphia's Annual Disparity Assessment of Workforce Diversity, the current employment hourly goals for Journeymen is 40% minority (22% African American, 15% Hispanic, and 3% Asian) and 5% female. Apprentice is 50% minority and 5% female. No oral interpretations will be made to any seller as to the meaning of the Drawings and Specifications. Every request for an interpretation shall be made in writing and email to Rosina.Depasquale@phila.gov, by Friday, September 19, 2025 SCOPE OF WORK A. The work of this Contract includes all work necessary to produce complete and fully usable water, sewer, and green stormwater infrastructure facilities (surface and subsurface) as shown and described in the Contract Documents. B. Construction shall not begin until all erosion and sedimentation control facilities have been installed and approved by the PWD Project Manager. The Contractor shall minimize disturbance within the working area wherever possible and restrict the limit of disturbance to the extent feasible. C. The paving work of this Contract has a designed service life of 40 years. All such work shall conform strictly to the requirements of the Philadelphia Streets Department and of the Pennsylvania Department of Transportation. D. Experience indicates that inadequate compacting of backfill in water, sewer, and above stormwater trenches frequently results in premature failure. The Contractor will be required to employ the best practices for placing and compacting backfill as directed in these specifications in order to prevent such failure. E. The Contractor shall be required to maintain a clean, functional, and safe worksite at all times. Measures indicated herein are considered the minimum acceptable requirements to maintain a responsible worksite. Site-specific conditions may mandate additional measures on any given project. In such cases, the Contractor is required to be amenable and responsive to requests from the PWD Project Manager to increase site management procedures in place. F. Water and Sewer 1. The water and sewer work of this Contract has a designed service life of 150 years. Because of the great expense involved in detecting, locating, and repairing defects, only the best methods and materials, and the most skilled laborers, shall be used in the performance of this work. U40-D180034-C-001

Bid Results

Water / Sewer

$10,715,665.00

Public - City

Site Work

48

26

5

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
853
Active Projects
435
Bidding Soon
6,241
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2025

December 1, 2025

Project location map

Multiple Locations, Philadelphia, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.