Published September 4, 2025 at 8:00 PM
Updated September 5, 2025
Site work and paving for a sidewalk / parking lot in Oregon, Ohio. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
LUC-Pickle Road PID No. 124618 City of Oregon Technical or scope of services questions specific to the project or RFP requirements. The services include preparation of construction contract and right of way plans for the LUC- Pickle Road and Sidewalk Project in the City of Oregon. This project is funded through Safe Routes to School (SRTS) and includes installing approximately 3,711 linear feet (LF) of 5-foot- wide sidewalk at the following locations along Pickle Road: 1. On the north side between Town Center Boulevard and Laura Lane 2. On the south side between the YMCA and Eastland Drive 3. On the north side between the Oregon Trail Bike Path and Heritage Lane 4. On the south side between the Oregon Trail Bike Path and Oaktree Court Additionally, the project includes construction of approximately 1,410 feet of 10-foot-wide asphalt shared-use path between Coy Elementary School and the Oregon Trail Bike Path. Estimated Construction Cost: $575,000.00 Prequalification Requirements for This Agreement Are Listed Below. For All Prequalification Categories Other Than Financial Management System Evaluation the Requirement May Be Met by the Prime Consultant or a Subconsultant. Also, Please Note That Only Individuals (Not Firms) Are Prequalified for Right of Way Acquisition Services. In Instances Where Prequalification for These Services is Required, a Prequalified Individual, Either Employed by the Prime Consultant or a Subconsultant, Must Be Named in Order To Meet the Requirement. It is anticipated that the selected Consultant will be authorized to proceed by October 2025. Completion Schedule The estimate, plans, and all corresponding files are to be completed and on file with the City of Oregon Department of Public Service and ODOT District 2 within twenty-four (24) months from the date of authorization or no later than December 1, 2027 Disadvantaged Business Enterprise (DBE) Participation Goal: NONE The method of contractor selection has not been determined at this time. OH DOT - RFP Engineering - LUC-Pickle Road
Conceptual
Sidewalks / Parking Lot
$575,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 12, 2028
Pickle Rd, Oregon, OH
Related To This Project
Oregon, OH
--
Oregon, OH
Bid Date: Nov 20 2025
Oregon, OH
--
Oregon, OH
Bid Date: Aug 05 2025
Oregon, OH
Bid Date: Aug 12 2025
Oregon, OH
Bid Date: Jun 10 2025
Oregon, OH
--
Oregon, OH
Bid Date: Jun 12 2025
Oregon, OH
Bid Date: May 28 2025
Oregon, OH
Bid Date: Jun 04 2025
Oregon, OH
Bid Date: Mar 18 2025
Oregon, OH
Bid Date: Feb 27 2025
Oregon, OH
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.