BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 6, 2025 at 7:00 PM

Updated November 7, 2025

Site work and paving for a mixed-use development in Southborough, Massachusetts. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

RRFB Installation - Southborough, MA. Project consists of reconstructing existing curb ramps and sidewalk, crosswalk and stop line pavement markings, and installation of solar-powered RRFBs at four locations. The project sites are open to the public, located at: 1. Richards Road at Moulton Road (Southborough, MA), 2. Main Street (Route 30) at Fay School (Southborough, MA), 3. Cordaville Road (Route 85) at Woodward School (Southborough, MA), and 4. Main Street (Route 30) West of CSX Railroad (Southborough, MA). The proposed work consists of constructing pedestrian crossing improvements at four (4) locations within the Town of Southborough. See the list below. The work under this Contract consists of reconstructing existing pedestrian curb ramps and sidewalk (at select locations), crosswalk and stop line pavement markings, and installation of solar-powered Rapid Flashing Beacons (RRFB). Some of the RRFB equipment will be procured in advance by the Town and installed by the Contractor as part of the Work under this Contract. Crossing Locations: Location 1: Richards Road at Moulton Road Location 2: Main Street (Route 30) at Fay School Location 3: Cordaville Road (Route 85) at Woodward School Location 4: Main Street (Route 30) West of CSX Railroad This Contract shall be fully performed by the Contractor in accordance with the provisions of the Contract Documents within 90 days of receiving delivery of the RRFBs from MassDOT, unless extended, in writing, at the sole discretion of the Town, and not subject to assent by the Contractor, and subject to the availability and appropriation of funds as certified by the Town Accountant. MassDOT estimates the expected delivery of the RRFBs to be mid-November, and as such, final completion of all Work is expected by February 28th, 2026. Time is of the essence for the completion of the Contract. The Work shall consist of the above plus all work incidental thereto, in accordance with the Specifications and conceptual plans attached hereto. Additional drawings showing details in accordance with which the Work is to be done may be furnished by addendum from time to time during the bidding period by the Owner or its Architect/Engineer and shall then become a part of the Contract Documents. Contractors shall be pre-qualified with MassDOT for Highway-Sidewalk and Curbing in order to bid on this project.

Bid Results

Roads / Highways

$106,470.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
632
Active Projects
243
Bidding Soon
4,737
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2025

October 24, 2025

Project location map

Multiple Locations, Southborough, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.