BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 6, 2025 at 7:00 PM

Updated December 7, 2025

This is a service / maintenance or supply contract in Morganton, North Carolina. Contact the soliciting agency for additional information.

Funding of $286,000 in FY2025-26 is for professional engineering services for building design and site work for an updated Solid Waste Operations and Vehicle Maintenance Building . The cost of construction for this building ($2,860,000) is scheduled for FY2027-28. The current crew building is a double wide trailer that is over 25 years old and lacks updated plumbing and electrical equipment. The trailer is poorly insulated and does not have adequate heating and air conditioning for employees. The flooring was replaced several years ago, but this was intended to be a temporary fix. Providing employees with a high-quality, comfortable space demonstrates the County's commitment to their well-being, which can increase employee satisfaction and increase retention rates. The new building will be a 3,000 square ft building. The Solid Waste Vehicle Maintenance Building is a 25 plus year old facility that has exceeded its useful life. Currently, the facility does not have stationary lifts and uses portable lifts to assist with repairs. The facility is not sufficient to accommodate larger vehicles such as tractor trailer, dozers, and compactors. The roof system is failing and there is not enough storage to safely cover equipment and tires. The upgrade will include 4,400 additional square footage of space. The project is included in the County's 2025-2035 Capital Improvement Program (CIP). As of December 06, 2025, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Municipal

$2,860,000.00

Public - County

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
245
Active Projects
143
Bidding Soon
1,759
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2028

Project location map

Multiple Locations, Morganton, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.