BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 3, 2025 at 8:00 PM

Updated October 4, 2025

Site work and paving for a mixed-use development in Eugene, Oregon. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Work Zone Traffic Control, Complete; 160 HR Flaggers; 1 LS Removal of Existing Pavement Markings; 1 LS Erosion Control; 1 LS Concrete Washout Facility; 8 EA Inlet Protection, Type 3; 1 LS Construction Waste Reuse and Recycling (CWRR) Report; 1 LS Pollution Control Plan; 1 EA Removal of Inlets; 94 FT Mainline Video Inspection; 4 FT 6 Inch PVC Storm Pipe; 94 FT 8 Inch PVC Storm Pipe; 2 EA Concrete Inlet, Type 4A; 5 EA Catch Basin, with Steel Bike Proof Grate; 8 EA Adjusting Boxes; 1 EA Connection to Existing Structures; 1 EA Abandon Pipes in Place; 4 EA Connection to Existing Pipe; 65 TN Level 2, 1/2 Inch ACP Mixture; 90 SY 10 Inch Asphalt Concrete Pavement Repair; 111 SY Plain Concrete Pavement, Undowelled, 10 Inches Thick; 285 FT Concrete Curbs, Curb and Gutter; 1,250 SF Concrete Walks, Ramp, 4 Inches; 80 SF Truncated Domes on New Surfaces; 16 EA Bi-Directional Yellow Type I Marker; 5 EA Mono-Directional White Type I Marker; 1 LS Thermoplastic, Extruded, Surface, Non-Profile; 410 SF Pavement Bar, Type B-HS; 5 EA Pavement Legend, Type B-HS: Arrows; 3 EA Pavement Legend, Type B-HS: Bike Lane Stencil; 50 FT Curb Marking, Methyl Methacrylate; 12 SF Signs, Standard Sheeting, Sheet Aluminum; 1 LS Traffic Signal Installation, 18th Ave & Hilyard St; 1 LS Interconnect System; 360 SF Lawn Seeding; 390 SF Bark Mulch; 10 EA Irrigation Repair/ Relocation All work must be completed by May 29, 2026 For more information regarding this project, contact Bryan Root at 541-501-0378 or broot@eugene-or.gov. This project contains a 0% DBE Goal. The City may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids or to waive any specification or requirement upon a finding of the City that it is in the public interest to do so. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The scope of work generally includes: o Span wire signal removal and replace with mast arm signalized intersection configuration. o Remove and replace sidewalk access ramps. o Striping. o New storm drains system.

Award

Roads / Highways

$675,823.00

Public - City

Paving, Site Work

29

3

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
16
Bidding Soon
315
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2025

October 24, 2025

Project location map

E 18th Ave & Hilyard St, Eugene, OR


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.