BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 18, 2025 at 7:00 PM

Updated November 19, 2025

Site work and paving for a civil project in Ellensburg, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Bid improvements consist of open channel canal replacement with large diameter pipeline, road improvements, drainage, earthwork and other work, all in accordance with the contract plans, the contract provisions, and the specifications. The improvements are for construction of water conservation and operational improvements to the KRD system. Requested work follows the existing South Branch Canal alignment starting downstream of the existing pipeline to open channel canal transition at Station 675+94 (MP12.8). The Project improvements in these documents are for pipeline and roadway improvements of existing open channel described as work related to canal improvements for 4,128 feet of pipe between existing canal Station 675+94 (MP12.8) and Station 718+68 (MP13.6). Question Deadline 10/04/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to District in writing. Total bonding capacity for all reaches if options are awarded is estimated at $4 million to $5 million. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The District specifically reserves the right, in its sole discretion, to reject any or all Bids or re-Bids or to waive inconsequential deviations from Bid requirements not involving time, price, or work quality. The Project improvements consist of open channel canal replacement with large diameter pipeline, road improvements, drainage, earthwork and other work, all in accordance with the contract plans, the contract provisions, and the specifications. The improvements are for construction of water conservation and operational improvements to the KRD system. Requested work follows the existing South Branch Canal alignment for a distance of approximately 2,100 feet from Milepost 12.40 to Milepost 12.80. Contractor will furnish all labor, materials, equipment, services, and construction facilities, and all general conditions, general requirements and incidentals required to complete the Work in its entirety as described in the Contract Documents. The Work of this Contract includes work covered by unit prices, allowances, and alternates as shown in the Bid Form. The Work of this Contract comprises construction of all the Work indicated, described in the Specifications, or otherwise required by the Contract Documents.

Award

Roads / Highways

$2,958,347.00

Public - City

Paving, Site Work

47

15

2

4

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
21
Bidding Soon
569
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2025

December 5, 2025

Project location map

To Be Determined, Ellensburg, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.