Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 21, 2025 at 7:00 PM
Updated November 22, 2025
Renovation of a power facility in Batavia, Illinois. Completed plans call for the renovation of a power facility.
As of October 16, 2025, this project has not yet been awarded. A timeline for the award has not yet been established. This is a cash project. 3. The City of Batavia Elec tric Util ity will receivesealed bids for the construc tion, includ ing any necessary labor and mate ri als needed to construct the MainSubsta tion Upgrade. The work for which bids arebeing received gener ally and briefly consists of thefollow ing: o Removal of four 34.5 kV line circuit breakers, acircuit switcher, four PTs, several bus structures, ameter ing build ing, and a number of foun dations. o Instal la tion of four (4) 34.5 kV line reclosers, a bustie and a trans former main reclosers, two (2) sets ofbus PTs and switch struc tures. o The instal la tion of a 34.5 kV bus differential relaypanel, wiring and other miscel la neous work associated. o Instal la tion of two (2) 34.5 kV pad mount switchgear. The substa tion is located at 130 Shumway Avenue,Batavia, IL 60510, and is the loca tion where theconstruc tion is to take place. 4. All work shall be in accor dance with the specifications as set forth in the Contract Docu ments, plans andother State and Local regu la tions as applic able. 5. The proposal from the Contrac tor shall consist ofthe submis sion of the completed Contract Documentsand supple men tal adden dums as received from theOwner. The bid shall be made on the BID PROPOSAL,BID SCHED ULE, BID CONDI TIONS, AND BIDFORM provided as part of these Bidding Documentsand shall be accom pa nied by a bid guar antee in theform of a Certi fied or Cashier's check from a responsible solvent bank or Bid Bond made payable to the Cityof Batavia in the amount of five percent (5%) of thebid amount. The amount of the bid guar antee shall beforfeited to the Owner if the Bidder neglects or refusesto enter into a Contract or to furnish performancesecu rity after the bid has been accepted. 6. The Contrac tor shall provide a writ ten statement aspart of the Bid submit tal of veri fy ing their ability tocommence work on the project within the time specified in the Contract Docu ments. The Owner reserves the right to deferthe accep tance of any bid and the award of a Contractfor a period not exceed ing sixty (60) days after thedate of open ing the bids. The success ful Bidder to whom the Contract shall beawarded shall sign the Contract, furnish a Performance Bond, or Letter of Credit in amounts equal toone hundred ten percent (110%) of the ContractAmount and required Certifi cates of Insur ance, withinfifteen (15) calen dar days after the Contract has beenawarded. Fail ure to do so shall make the Contract nulland void. 9. Bidders are advised of the follow ing requirements ofthis contract: 1) Illi nois Prevail ing Wage; 2) 5% BidSecu rity with submit tal of bid; 3) 110% PerformanceSecu rity within fifteen (15) calen dar days afterContract award; 4) applic a ble OSHA and EPA requirements. Question Deadline 09/30/2025 at 10:00 AM CT If any person, contemplating submitting a bid for the proposed contract is in doubt as to the true meaning of any part of the specifications, or other proposed contract documents, they may submit to the Owner a written request, no later than 10 AM local time, and seven business days prior to the bid opening, All requests for interpretations regarding this project may be directed to City of Batavia - Main Construction Services, ATTN: Erika Sittler at esittler@cityofbatavia.net and a copy sent to Daniel Stark, project engineer, at starkd@powersystem.org.
Award
Power Plant
$784,887.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 9, 2025
January 1, 2026
130 Shumway Ave, Batavia, IL
Related To This Project
Batavia, IL
Bid Date: Sep 15 2025
Batavia, IL
Bid Date: Sep 17 2025
Batavia, IL
Bid Date: Nov 18 2025
Batavia, IL
Bid Date: Nov 06 2025
Batavia, IL
Bid Date: Dec 04 2025
Batavia, IL
Bid Date: Sep 17 2025
Batavia, IL
Bid Date: Oct 03 2025
Batavia, IL
Bid Date: Sep 03 2025
Batavia, IL
Bid Date: Aug 29 2025
Batavia, IL
Bid Date: Sep 03 2025
Batavia, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
