BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 16, 2025 at 8:00 PM

Updated October 17, 2025

Site work and paving for a road / highway in Costa Mesa, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The scope of work generally consists of mobilization, traffic control, erosion control, procurement and application of Slurry Seal Type II with 2.5% latex, crack sealing; notifications to businesses and residents; traffic signing; striping and markings, including new bicycle facilities, landscaping and irrigation, median modifications, and installation of pavement markers along Adams Ave. (from Harbor Blvd. to Fairview Rd.). Submit one electronic copy of the proposal, pages P1-P32, DB9-DB15, C1, and the electronic Line Items section, and bid bond as outlined in the Notes Section. All required forms and sections of the Bid must be submitted via online. Bidder is solely responsible for "on time" submission of their electronic bid. The Bid Management System will not accept late bids and no exceptions shall be made. Bidders will receive an e-bid confirmation number with a time stamp from the Bid Management System indicating that their bid was submitted successfully. The City will only receive those bids that were transmitted successfully. ORIGINAL SEALED COPY OF BIDDERS BOND MUST BE SUBMITTED TO THE CITY CLERK, 77 Fair Drive, Costa Mesa, CA, PRIOR TO BID OPENING DATE. All responses for this Bid are due at or before the time shown on each Notice Inviting Bids. Late responses will not be accepted. Hard copy responses of Submittals WILL NOT be accepted. The City is not responsible for and accepts no liability in the event a response is late due to any network, internet, or any other technical problem or interruption. Electronic PDF files of the plans, specifications and bid documents are available. The City is not responsible for any errors that may occur from the printing of any of these documents by bidders, including, but not limited to: scaling issues, print quality, failure to print and submission of all required documents. The Bid Results are immediately available to the public via online following the Bid Opening Date (Bid Due Date). The bidder is solely responsible for "on time" submission of their electronic bid. The City will only consider bids that have been transmitted successfully and have been issued an e-bid confirmation number with a time stamp from the Bid Management System indicating that bid was submitted successfully. Transmission of bids by any other means will not be accepted. Bidder shall be solely responsible for informing itself with respect to the proper utilization of the bid management system, for ensuring the capability of their computer system to upload the required documents, and for the stability of their internet service. Failure of the bidder to successfully submit an electronic bid shall be at the bidder's sole risk and no relief will be given for late and/or improperly submitted bids. Bidders experiencing any technical difficulties with the bid submission process may at online. Prevailing Wage Compliance Requirement. Davis Bacon Wage Federal Requirement. DIR Registration Requirement. Community Workforce Agreement Project. Liquidated Damages $5,200 per day Online Q&A Yes Q&A Deadline 10/02/2025 5:00 PM (PDT) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% License Requirements California Contractor's License Class "A" (General Engineering Contractor) Start/delivery Date Within Ten (10) Days After Date of Contract Project Duration Within Ninety (90) Working Days From the of Commencement of Such Work Unless Legal Extension is Granted in Accordance With the Terms Set Forth in the Specification sension is Granted in Accordance With the Terms Set Forth in the Specifications Project Type Bid Response Types Line Items Subcontractor Bid Bond General Attachment (required) Type of Award Lump Sum

Bid Results

Roads / Highways

$2,268,636.00

Public - City

Paving, Site Work

24

11

6

6

Subscribe For Documents

93 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
727
Active Projects
292
Bidding Soon
3,571
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2025

December 15, 2025

Project location map

Adams Ave, Costa Mesa, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.