Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 9, 2025 at 7:00 PM
Updated December 10, 2025
Site work for a playground / park / athletic field in Costa Mesa, California. Completed plans call for site work for a one-story above grade playground / park / athletic field.
License Requirements C-27 Project Duration 72 Calendar Days Question Deadline 10/03/2025 at 5:00 PM PT Online Q&A Yes This project restores the athletic field at Whittier Elementary School (1800 Whittier Ave, Costa Mesa, CA). Work includes soil prep, topsoil placement, hydroseeding, and irrigation adjustments to establish new perennial ryegrass turf. The school will remain in session, requiring strict safety measures, fencing, dust control, and daily clean-up. Contractor provides all materials, protects existing utilities/irrigation, maintains safe access, and coordinates schedules with the District. Completion is required by 12/31/25 (including 6-8 weeks of turf propagation), with interim and final walk-throughs to ensure proper growth before District acceptance.
Award
Playgrounds / Parks / Athletic Fields
$119,938.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 10, 2025
October 21, 2025
1800 Whittier Ave, Costa Mesa, CA
Related To This Project
Costa Mesa, CA
Bid Date: Oct 07 2025
Costa Mesa, CA
Bid Date: Nov 12 2025
Costa Mesa, CA
Bid Date: Dec 23 2025
Costa Mesa, CA
Bid Date: Nov 21 2025
Costa Mesa, CA
Bid Date: Jan 07 2026
Costa Mesa, CA
Bid Date: Dec 23 2025
Costa Mesa, CA
Bid Date: Jan 14 2026
Costa Mesa, CA
Bid Date: Jan 21 2026
Costa Mesa, CA
Bid Date: Oct 08 2025
Costa Mesa, CA
Bid Date: Sep 25 2025
Costa Mesa, CA
Bid Date: Sep 26 2025
Costa Mesa, CA
Bid Date: Oct 14 2025
Costa Mesa, CA
Bid Date: Oct 07 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
