Published April 30, 2026 at 8:00 PM

Updated May 20, 2026

Site work and new construction of a transportation facility in Greer, South Carolina. Completed plans call for the construction of a transportation facility; and for site work for a transportation facility.

Project Description: The project consists of construction of an ATCT with a single story base building roughly 17,868 square feet in size. The combined facility will be erected on an approximately 5 acre site. The ATCT and TRACON/Base Building will be compliant with International Building Code (IBC) Risk Category IV. The ATCT is 187 feet (ft) Above Ground Level (AGL) to the top of the structure. The structure has, to include appurtenances, with 12 levels and will be constructed from structural precast concrete panels and structural steel. The ATCT shaft will have two egress staircases and two elevators. The 12-sided cab is 679 square feet and is situated such that eye level elevation is 178 ft AGL. Below the cab are four occupied levels containing the console access level, junction level (including a break room and restrooms), electronics equipment level, and spaces for electrical and mechanical equipment. A guardrail which can also serve an antennae ring is situated on the roof above the cab. The TRACON/Base Building will contain administrative offices, bathrooms, conference rooms, shipping and receiving space, storage space, fire protection system space, air handlers, the TRACON, equipment racks, electrical space and the critical power distribution system which includes one engine generator, one facility Uninterruptable Power Supply (UPS) with battery rack, automatic transfer switches, and critical power panel space. General Information: RFI Deadline - 3/6/2026, 5 PM EST - Submit to applicable estimator below. Schedule - Project duration is 730 calendar days. Proposal Review Period - Pricing is to be good for 120 calendar days. Proposals - A lump sum proposal on company letterhead is acceptable. Include breakdown per owners Bid Forms (see General Documents folder in Plan oom). Payment and Performance Bond - All subcontracts exceeding $250,000 will require a P&P bond. Include your firms rate in your proposal. Interested bidders should contact the following estimators. Division Estimator Phone Email Div 03-05 Conner Stevens 312.563.5402x8838 cstevens@walshgroup.com Div 07, 08 Dave Uhlenhake 312.563.5402x8893 duhlenhake@walshgroup.com Div 06, 09 David Fryxell 312.563.5402x8235 dfryxell@walshgroup.com Div 10-14 Viviana Rivera Vasquez 312.563.5402x8216 vriveravasquez@walshgroup.com Div 21-25 Josh Deliman 312.563.5402x8869 jdeliman@walshroup.com Div 26-28 Chris Duggan 312.563.5402x8320 cduggan@walshgroup.com Div 02, 31-33 Matt Maiers 312.563.5402x8894 mmaiers@walshgroup.com Thank you for your interest. We look forward to receiving your proposal. Market Survey Overview Purpose: To identify potential vendors and gather industry feedback for the upcoming ATCT replacement at GSP Airport. Solicitation Number: 697DCK-26-R-00015 NAICS Code: 236220 - Commercial and Institutional Building Construction Type: Sources Sought / Market Survey (not a solicitation) Response Method: Email only, including: Statement of interest in bidding Capability statement aligned with the Market Survey Package 1 Project Scope (Draft) Construction of a new ATCT approximately 190 feet tall Includes: 16,000 SF base building 55-space parking lot Demolition of existing ATCT Utility trenching and site preparation No change in aircraft operations or types at GSP 2 Site Options Two candidate sites were evaluated in the Supplemental Environmental Assessment (EA): Site H Northeast of airport Challenges: View blockage of Taxiway L8 Limited control over Taxiway L9 Requires additional equipment and procedural changes Site 12 (Preferred) Also northeast of airport Similar topography and layout Slight view blockage concerns mitigated by design adjustments Important Notes This is not a guarantee of procurement. No commitment to contract, set-aside, or competition strategy. No reimbursement for costs incurred in responding. Vendors must be registered in SAM.gov to participate in future solicitations. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Transportation Terminals

$40,000,000.00

Public - Federal

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
228
Active Projects
102
Bidding Soon
1,559
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2026

May 28, 2026

Project location map

2000 GSP Dr, Greer, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.