Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published October 8, 2025 at 8:00 PM
Updated October 9, 2025
Demolition, site work, renovation and addition to a mixed-use development in Carthage, Tennessee. Completed plans call for the addition of a municipal facility; for the demolition of a municipal facility; for the renovation of a municipal facility; for site work for a municipal facility; and water / sewer project.
As of October 08, 2025, project was awarded to Wright Brothers Construction Co., Inc., awarded amount is $7,200,519.25. The Scope of Work (as defined herein) for such construction includes providing all labor, materials (minus Owner supplied materials), equipment, incidentals, and services necessary and required for constructing Southern Expansion Phase 1 including but not limited to: mobilization, site preparation, dewatering, surveying services, furnishing and installing temporary erosion and sedimentation control structures, borrow area rock drilling and blasting, mass excavation, structural fi ll, subgrade preparation, compacted soil liner construction, geosynthetics installation, drainage layer installation, protective cover installation, excavation and backfi lling of anchor trenches, construction of leachate collection sump and force main, overhead electric, temporary haul roads, demobilization, and all related work and incidentals pursuant to the Proposal and Contract Documents including, but not limited to, the Technical Specifications and Contract Drawings. Questions concerning this Request for Proposals shall be submitted to both the Owner and Engineer at the email addresses listed below. The deadline for potential Proposers to submit questions related to the Request for Proposals shall be 5:00 pm CDT on Wednesday, September 10, 2025. The Owner reserves the right to reject any or all Proposals or portions of any or all Proposals and to waive informalities therein to determine the most qualified Proposal. A Pre-Proposal Conference will not be held for this project; however, Proposers may schedule a site visit with the Solid Waste Director prior to submitting proposals if desired. Furnish all labor, materials, equipment and incidentals required to complete and make ready for operation, all valves and appurtenances as shown on the Drawings and as specified herein. B. This Section does not include valves for combustible or flammable liquids or gases. C. The equipment shall include, but is not limited to, the following: 1. Gate Valves 2. Butterfly Valves 3. Stainless Steel Ball Valves 4. Air Valves 5. PVC Ball Valves 6. PVC Check Valves 7. Yard Hydrants 8. Backflow Preventers 9. Valve Operator Accessories
Award
Municipal
$7,200,519.00
Public - County
Addition, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
