BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 14, 2025 at 8:00 PM

Updated October 15, 2025

Renovation of a detention facility in Chippewa Falls, Wisconsin. Completed plans call for the renovation of a detention facility.

This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids receivhttps://crm.bidclerk.com/project/7238500.html#panel1ed. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. All potential bidders must be certified by DOA prior to submitting bids on state construction projects over $100,000. Bid Date Note : PDF scanned file of all required bid documents, including bid and bid bond forms with original wet signatures or properly transmitted electronic signatures (only PDF files will be accepted) submitted via online. The bidder is responsible for the sealed bid being delivered to the indicated location or submitted via online. In general, the work consists of: Removing ceilings, lights, rediant heating, and VAV Boxes. Installing a new ceiling with LED lighting and VAV Boxes for cooling and hot water heating coils. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Please submit forms to: Sheila Pelhowski Sheila.Pelehowski@wisconsin.gov (715) 382-6562 Question Deadline 09/29/2025 Bidders shall bring inadequacies, omissions or conflicts to the Architect/Engineer's attention at least ten (10) days before MEP bidding commences. Custom Bid Result Mechanical Badger State, Inc. $510,060 Electrical Hudson Electric, Inc .$90,223

Bid Results

Jails / Prisons

$600,283.00

Public - State/Provincial

Renovation

20

16

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
56
Bidding Soon
475
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2025

March 10, 2026

Project location map

2909 E Park Ave, Chippewa Falls, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.