Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 13, 2026 at 7:00 PM
Updated February 14, 2026
Demolition, site work, paving and new construction of a mixed-use development in Chippewa Falls, Wisconsin. Completed plans call for site work for a water / sewer project; road / highway; sidewalk / parking lot; for the demolition of a water / sewer project; for the construction of a water / sewer project; for paving for a sidewalk / parking lot; and road / highway.
In general, the work consists of: replacing the existing sanitary sewer lift station for the DHS Northern Wisconsin Center in Chippewa Falls, Wisconsin. Site work will include removal of existing package lift station, construction of a new submersible lift station, new gravity sewers, manholes and force main piping. paving, grading, seeding, and erosion control. All potential bidders must be certified by DOA prior to submitting bids on state construction projects over $100,000. Base Bids will be received as a single lump sum bid for: 5) Electrical. This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening. DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. NOTICE: The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. Event bid date notes : Hand delivery to the drop box labeled sealed bids only in front of the state of Wisconsin Administration Building located at 101 East Wilson Street, Madison, Wisconsin 53703.
Post-Bid
Water / Sewer
$630,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 11, 2026
March 13, 2026
2820 E Park Ave, Chippewa Falls, WI
Related To This Project
Chippewa Falls, WI
Bid Date: Jan 27 2026
Chippewa Falls, WI
Bid Date: Dec 18 2025
Chippewa Falls, WI
Bid Date: Dec 04 2025
Chippewa Falls, WI
Bid Date: Dec 09 2025
Chippewa Falls, WI
Bid Date: Nov 06 2025
Chippewa Falls, WI
Bid Date: Oct 30 2025
Chippewa Falls, WI
Bid Date: Oct 16 2025
Chippewa Falls, WI
Bid Date: Oct 09 2025
Chippewa Falls, WI
Bid Date: Oct 23 2025
Chippewa Falls, WI
Bid Date: Sep 04 2025
Chippewa Falls, WI
Bid Date: Aug 14 2025
Chippewa Falls, WI
--
Chippewa Falls, WI
Bid Date: Jun 16 2025
Chippewa Falls, WI
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
