Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 30, 2025 at 8:00 PM
Updated October 1, 2025
Site work and paving for a mixed-use development in Haysi, Virginia. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
PAVE PARKING AREA, JOHN W. FLANNAGAN DAM & RESERVOIR, HAYSI, DICKENSON COUNTY, VA The contractor shall provide all materials, equipment, labor, layout of work features, and supervision necessary to complete paving work. Construction will include applying a tack coat conforming to VDOT Item 310-1 at a rate of 0.10 gallons per square yard on all resurfaced areas, followed by placement of a 2-inch surface course of asphalt concrete pavement conforming to VDOT Item 315-1. Paving will begin at the entrance to the project office from the main road and continue through the main office parking area, totaling 4,000 square yards of full-depth pavement over an existing gravel base. The contractor must ensure proper drainage with no standing water and prepare the site to eliminate low or high spots. In areas without an existing base, the contractor shall place and compact an additional 2 to 4 inches of aggregate base per VDOT Item 309-1, followed by a two-layer asphalt base course per VDOT Item 315-1, BM-2. A tack coat shall be applied at 0.10 gallons per square yard, and a 1-inch asphalt surface course conforming to VDOT Item 315-1, SM-2-A shall be placed over all base material. Asphalt shall be tapered to adjoining roads and parking areas. A reference drawing is included, though not to scale and buildings shown are no longer present. Pave 4000 square yard parking lot as shown in Attachments at John W. Flannagan Dam and Reservoir Project Office: 2204 Flannagan Dam Rd. Haysi, VA 24256. Magnitude of Construction is Between $100,000 and $250,000. The Contractor Shall Begin Performance Within 10 Calendar Days and Complete It Within 30 Calendar. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Overall Contract Delivery Period - From 26 Sep 2025 to 27 Oct 2025
Award
Sidewalks / Parking Lot
$163,530.00
Public - Federal
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 17, 2025
September 26, 2025
2204 Flannagan Dam Rd, Haysi, VA
Related To This Project
Haysi, VA
Bid Date: Jul 13 2020
Haysi, VA
Bid Date: Oct 07 2024
Haysi, VA
Bid Date: Feb 13 2024
Haysi, VA
Bid Date: Feb 13 2024
Haysi, VA
Bid Date: Jan 27 2022
Haysi, VA
Bid Date: Sep 07 2023
Haysi, VA
Bid Date: Aug 11 2023
Haysi, VA
Bid Date: Jun 08 2023
Haysi, VA
Bid Date: Mar 23 2023
Haysi, VA
Bid Date: Feb 14 2023
Haysi, VA
Bid Date: Apr 29 2022
Haysi, VA
Bid Date: Mar 22 2022
Haysi, VA
Bid Date: May 05 2022
Haysi, VA
Bid Date: Aug 25 2022
Salem, VA
Bid Date: Sep 10 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
