Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 20, 2025 at 8:00 PM
Updated September 21, 2025
Renovation of a municipal facility in Pollock Pines, California. Completed plans call for the renovation of a municipal facility.
Solicitation Overview Project Title: El Dorado HotShot HVAC Solicitation Number: 127EAW25R0058 Location: El Dorado National Forest Magnitude of Construction (FAR 32.204): Between $25,000 and $100,000 Set Aside: Total Small Business Set Aside Amendment Purpose RFI Round 1 Responses Posted Document titled "RFI Official Responses - 1" is now part of the solicitation. Important: Failure to use revised documents will result in a non-responsive proposal. Important Dates & Instructions Site Visit: Thursday, August 28, 2025 10:00 AM PST Details in 1. Statement of Work attachment RSVP to: gregory.cunningham@usda.gov RFI Submission Deadline: 1300 hours PST, September 3, 2025 Use the attached RFI form Submit to: Greg Cunningham, Contracting Officer SCOPE OF CONTRACT The scope of this project entails, but is not limited to, remove and dispose of the existing exterior condenser and associated AHU to be replaced with a system consisting of mini-split AC units and a ductless heat pump. This building houses the Eldorado IHC team and is located at 5420 Sly Park Rd., Pollock Pines CA 95726. New systems shall have CA compliant refrigeration systems. All new equipment shall be Carrier branded or an approved equivalent for system compatibility and warranty purposes. All associated equipment such as thermostats and controls will be compatible with the new equipment as recommended by the manufacturer. The Contractor shall be responsible for providing all labor, tools, material, and equipment necessary to perform all work in strict accordance with the specifications, drawings and industry standards. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for the items shown. See attachment "1. Statement of Work" for further details. C.2 PROJECT LOCATON 5420 Sly Park Rd., Pollock Pines, CA 95726 C.3 MAGNITUDE OF CONSTRUCTION PROJECT FAR 32.204 - Disclosure of Magnitude of the Construction Project: o Between $25,000 and $100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Municipal
$30,665.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 10, 2025
October 10, 2025
5420 Sly Park Rd, Pollock Pines, CA
Related To This Project
Pollock Pines, CA
Bid Date: Jan 14 2026
Pollock Pines, CA
Bid Date: Oct 24 2025
Pollock Pines, CA
Bid Date: Dec 03 2025
Pollock Pines, CA
--
Pollock Pines, CA
Bid Date: Jul 25 2025
Pollock Pines, CA
Bid Date: Apr 25 2025
Pollock Pines, CA
--
Pollock Pines, CA
Bid Date: Mar 25 2025
Pollock Pines, CA
Bid Date: Oct 31 2024
Pollock Pines, CA
Bid Date: Jun 18 2024
Pollock Pines, CA
Bid Date: Dec 09 2025
Pollock Pines, CA
Bid Date: Apr 30 2024
Pollock Pines, CA
Bid Date: Mar 20 2024
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
