BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 1, 2025 at 8:00 PM

Updated November 2, 2025

Demolition, site work, paving, outdoor lighting and new construction of a mixed-use development in Duquesne, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; and for outdoor lighting for a road / highway.

The description and location of the project is as follows: This is a partial Design Build roadway project. Design activities are limited to: Scupper and downspout drainage system. For the bridge preservation, roadway approach reconstruction, drainage, curb and sidewalk, barrier, highway lighting, signing and pavement markings, delineation, and other miscellaneous construction, all within a length of 3,739.14 linear feet (0.708 miles) as indicated on the approved drawings included in the bid package for State Route 2114, Section A05 (Mckeesport Duquesne Bridge), in Allegheny County, Cities of Mckeesport and Duquesne, Commonwealth of Pennsylvania. This project being situated as follows: From a point approximately 450 feet south of the intersection with Center Street/South Linden Street at State Route 2114 Segment 0030 Offset 0963/State Route 837 Segment 0263 Offset 2003 (Station 395+00) to a point approximately 400 feet south of the Bowman Ave overpass at State Route 2114 Segment 0010, Offset 0658 / Segment 0011, Offset 0834 (Station 54+59). Project Cost Range: $50,000,000.00 - $59,999,999.99 Federal Project Status: PENNDOT Oversight NHS DBE: 5% Structure Work: 83.00% Pre-Bid Meeting: None Anticipated NTP: 11/24/2025 Wage Rates: Yes Required Completion: 09/22/2028 Prequalification Requirement: Yes State Type of Work: Bridge Reconstruction Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an addendum. The deadline for submitting questions is 72 hours before the let date and time. For emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - SRFP D/B - Scupper and Downspout Drainage System *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$50,777,777.00

Public - State/Provincial

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

857

17

48

7

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
219
Active Projects
115
Bidding Soon
1,623
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2025

November 24, 2025

Project location map

SR 2114, Duquesne, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.