BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 19, 2025 at 7:00 PM

Updated November 20, 2025

Site work and renovation of a civil project in Toledo, Ohio. Working plans call for the renovation of a bridge / tunnel; for site work for a bridge / tunnel; water / sewer project; and water / sewer project.

Vendors are advised that the City of Toledo intends to advertise for Construction Manager at Risk for Improvement 44 C/D, Secondary Tunnel Roof Replacement and Restoration project. This project is part of the Bay View Water Reclamation Plant Improvements Program. Pertinent project information is as follows: o Projected RFP Advertisement: Approximately mid-September to mid-November 2025 o Estimated Construction Cost: $10,250,000 o Location: Bay View Water Reclamation Plant, 3900 Summit St., Toledo, Ohio o Rough Project Scope: o Replacement of the West Secondary Tunnel concrete roof, sealing of wall cracks, and repair of concrete joints. o Repair of wall cracks, concrete joints, and spalling concrete in the East Secondary Tunnel. o Construction of a new gallery building on the West Tunnel and new galleries over two East Secondary Tunnel stairwells. o Ventilation upgrades to the West Secondary Tunnel. o Replacement of tunnel sump pumps. o Removal of abandoned piping, equipment, and conduit. o Replacement of mixed liquor channel gates. o Replacement of piping. o Replacement of grating. o Replacement of valve actuators. o Replacement of lighting. o Painting of structural steel, pumps, piping, and handrail in the vicinity of Final Tanks 1-6, and 12. o Handrail modifications. Online Q&A Yes Q&A Deadline 11/06/2025 4:00 PM (EDT) Contact Info Questions must be submitted thru the Q & A tab of this bid Bids to Division of Purchases and Supplies Scope of Services The City of Toledo DPU/ Water Reclamation is providing a Notice of Intent to advertise for a Construction Manager at Risk (CMAR) for a project to replace West Secondary Tunnel concrete roof, make concrete repairs, construct new gallery buildings on the West and East Tunnels, ventilation upgrades, and other miscellaneous improvements in the Tunnel areas. Project Duration 36 months Construction December 2026-May 2028 The Estimated Construction Cost is $10-$12 million. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Water / Sewer

$12,000,000.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
350
Active Projects
198
Bidding Soon
2,459
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2025

December 1, 2026

Project location map

3900 Summit St, Toledo, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.