BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 1, 2025 at 8:00 PM

Updated October 2, 2025

Renovation of an office development in Danville, Pennsylvania. Working plans call for the renovation of a office development.

As of October 1, 2025, the project will rebid but no definite date yet. Gatehouse HVAC and Electrical Upgrades Project The Work comprises installation of a new HVAC system in the existing building as well as electrical upgrades throughout the building. Twelve individual wall units are to be installed into all major rooms with their own wireless controlled thermostats. The existing heat system is to be left in place to allow for back-up or supplemental heating, as needed. Three main outdoor condenser inverters, one for each floor, will be located along the exterior of the facility and all required piping and electrical connections will travel underground, through the foundation wall, and into the basement where it will be dispersed throughout the building. All necessary infrastructure will travel from floor to floor via locations near the current radiator pipes. All power, condensation, return, and supply lines will be concealed along the ceiling, as needed, by crown molding. Where crown molding is required, it will be placed around the entire perimeter of the room involved. Boxed out corners will be used to allow necessary components to run down the walls. Nothing additional is to be installed onto the exterior of the building. Additionally, miscellaneous electrical work and upgrades are to be completed throughout the building and are outlined in technical specification (Part III) section 04060 of these Contract Documents. The Work is to be completed in two contracts, Mechanical Construction and Electrical Construction, as is outlined on the Bid Form. If more than one contractor is selected, they are responsible for coordination with one another for successful completion of the project. Contractor(s) are responsible for coordination with the Engineer, SEDA-COG and The Gatehouse in order to complete the work and to obtain all required permits from the Township Third Party Agency. Work is to be completed in accordance with all manufacturers' recommendations and these Contract Documents. Question Deadline 09/19/2025 at 4:00 PM ET Online Portal OMPLETION OF WORK: Time is of the essence. The Work must be substantially completed, signed, dated and approved on the Notice of Substantial Completion Form by the Engineer, Contractor and Owner within 60 calendar days after the commencement date stated in the Notice to Proceed. Liquidated damages will be assessed for each calendar day at $1,000.00 per day for failure of the Contractor to substantially complete the Work within the calendar days reserved for the Contract and/or for failure to sign and date the Notice of Substantial Completion Form.

Final Planning

Office

$124,500.00

Public - City

Renovation

5

14

4

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
305
Active Projects
158
Bidding Soon
1,886
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2025

April 6, 2026

Project location map

21 Gatehouse Dr, Danville, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.