BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 21, 2025 at 8:00 PM

Updated October 22, 2025

Renovation of an educational facility in Gainesville, Florida. Completed plans call for the renovation of a educational facility.

Replacement of Cooling Tower 1 The University of Florida is seeking qualified contractors to bid on the full replacement of Cooling Tower 1 at the Lacy C. Rabon Chilled Water Plant. This tower is a critical component of the campuss chilled water infrastructure, serving Chiller 1, the plants most vital chiller during peak cooling season. Scope of Work Includes: Complete replacement of the 3-cell Marley Cooling Tower using the existing basin footprint (48L x 418W). Integration with existing piping and Condenser Water Pump 1. Engineering drawings (structural, mechanical, electrical) post-award. Demolition and debris removal, with retention of select components by UF. Installation of new electrical connections, fan motors, disconnects, vibration and safety switches. Mechanical piping, cooling tower fans (metal blades only), gearboxes, fill, drift eliminators, and motor space heaters. Construction of stair access and gangway integration with adjacent towers. Structural evaluations and approvals if access modifications are required. One-year warranty on materials and workmanship. Completion of final punch list as provided by UF. All questions can be directed to Rejoy Varghese, Procurement Agent III, at rejoy.varghes@ufl.edu

Post-Bid

Educational

$1,750,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
86
Bidding Soon
1,578
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2025

December 1, 2025

Project location map

1858 Mowry Rd, Gainesville, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.