Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 15, 2025 at 8:00 PM

Updated September 24, 2025

Renovation of a fitness / recreation center in South Windsor, Connecticut. Completed plans call for the renovation of a fitness / recreation center.

Furnish all labor, materials, equipment, services necessary for the removal of existing asphalt shingle roof systems down to the existing wood plank roof deck and the installation of a new fiberglass reinforced asphalt shingles of approximately 6,725 sq. ft. on a sloped wood plank roof deck. South Windsor Public Schools (SWPS) reserves the rights to: amend or terminate this Request for Proposal; accept all or any part of a proposal; reject any or all proposals, in whole or in part; waive any technical defects, informalities or non-material deficiencies in a proposal; and award the proposal, in whole or in part, including accepting a proposal or part of a proposal, that, in its judgment, will be in South Windsor Public School's best interests. a. Furnishing all labor, materials, equipment, services and incidentals necessary for the removal of existing asphalt shingle roof systems down to the existing wood plank roof deck and the installation of a new fiberglass reinforced asphalt shingles of approximately 6,725 sq. ft. on a sloped wood plank roof deck. The new roof system shall have a 50 year warranty equal to the GAF Timberline Golden Pledge roof system. b. Other significant work includes replacement of deteriorated wood plank roof deck. c. General and Subcontract Bids shall consist of but are not limited to: general construction, carpentry, sheet metal work, site restoration and all other work necessary for or incidental to the full completion of the entire project, including all equipment, labor, material, and incidentals in connection therewith. Questions regarding the bid or the Contract Documents may be directed to Hibbard and Rosa Architects, L.L.C., 100 Riverview Center, Suite 272, Main Street, Middletown, Connecticut, 06457, Attn: Mr. Thomas Hibbard. E-mail; tom@hra.bz and Mr. Darrell Crowley, SW Public Schools. dcrowley@southwindsorschools.org

Post-Bid

Fitness / Rec Centers

$200,000.00

Public - City

Renovation

7

9

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,164
Active Projects
537
Bidding Soon
7,190
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2025

October 23, 2025

Project location map

1737 Main St, South Windsor, CT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed