Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 20, 2026 at 8:00 PM
Updated May 20, 2026
Site work and new construction of a recreation facility in Bradley, Illinois. Design plans call for the construction of a 90,000-square-foot recreation facility.
https://www.shawlocal.com/daily-journal/2026/04/19/bradley-moves-forward-on-waterpark-groundbreaking-nears/ Plans continue to move forward on the planned Mattel Wonder Indoor Waterpark in Bradley. At this week's Bradley Village Board meeting a new design firm was also added to the development team. (Provided by Mattel) By Lee Provost While not a single piece of earthmoving equipment has moved onto the acreage where the Bradley-based waterpark is planned, forward movement continues. At this week’s Bradley Village Board meeting, the trustees unanimously approved a resolution for inclusion of a new engineering firm to join the development of the Mattel Wonder Indoor Waterpark. The new firm, one that has worked with Mattel on similar waterpark developments, Martin Aquatic Design and Engineering, Inc., of Orlando, Florida, will split engineering and design duties with Sauk City, Wisconsin-based Ramaker and Associates. In basic terms, Martin Aquatic will focus on the “wet portions” of the park, meaning a water tower, slides, splash pads, pool, swim-up bar, water spouts/sprinklers, lazy river, wave pool, and other similar attractions. Martin will also be responsible for the design of the waterpark’s theming, which, of course, will be related to Mattel’s wide assortment of character creations. The year-round park has been projected to attract tens of thousands from throughout the Midwest to Bradley and Kankakee County seeking water fun and pumping millions into the region’s economy. Ramaker, on the other hand, will move forward on “dry areas” on design and engineering regarding park areas such as retail, arcades, restrooms, kitchens/food, and other similar areas. Ramaker has been working with Bradley for at least two to three years on projects and in particular, the planned 2-acre indoor waterpark. This move, however, puts a design firm that has great familiarity with Mattel together, Mayor Mike Watson said. The thought is development can come together quicker based on their previous work history. While many changes have been discussed and are in various stages of design, Watson said the development costs will not exceed $100 million. And, of course, time is of the essence in terms of designing, engineering, building, and opening the park, projected to be ready for guests by late 2027 or, more likely, early 2028. Development costs for the initial construction on 20-acre site most recently used to raise corn, immediately southeast of the first targeted site at Northfield Square mall site. Originally slated to be an indoor waterpark, of which about 2 acres would be under a glass-enclosed structure, the development is going through numerous changes since Mattel joined the development in December 2025. The glass enclosed area could be upwards of 2.5 to 3 acres under the protection of the glass and steel structure. Watson said after the meeting the groundbreaking for the site still remains scheduled for this summer. To meet the projected opening, construction needs to begin in that general timeframe, he said. At the board meeting, trustees also approved a change order with OpenAire Sales, Inc., the Ontario, Canada, firm that is designing the enclosure. The change will allow for the creation of a separate freestanding glass tower enclosure for the water slide. Prior to the design change, the structure had a cupola to keep all the slide under the roof. ---------------------------------------------------------------------------------------------------------------------------- As of January 13 2026 There is a indoor water park for the city of Bradley in planning.
Design
Amusement and Recreation
$81,000,000.00
Public - City
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 25, 2026
To Be Determined, Bradley, IL
Related To This Project
Bradley, IL
Bid Date: Jan 28 2026
Bradley, IL
Bid Date: Mar 27 2026
Bradley, IL
Bid Date: Mar 16 2026
Bradley, IL
Bid Date: Mar 09 2026
Bradley, IL
Bid Date: Apr 06 2026
Bradley, IL
Bid Date: Jun 01 2026
Bradley, IL
Bid Date: May 28 2026
Bradley, IL
Bid Date: Apr 10 2026
Bradley, IL
Bid Date: Jan 07 2026
Bradley, IL
Bid Date: Jan 07 2026
Bradley, IL
Bid Date: Sep 03 2025
Bradley, IL
Bid Date: Jul 02 2025
Bradley, IL
Bid Date: Jun 13 2025
Bradley, IL
--
Bradley, IL
Bid Date: Jun 10 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
