BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 14, 2025 at 7:00 PM

Updated November 15, 2025

Site work and paving for a road / highway in Marietta, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Furnishing all labor, material, equipment and other things necessary for the complete construction of: Project No./Project Name: B2308 / East-West Connector at Fontaine Road and Cooper Lake Road Project Description: This project consists of safety improvements on the East-West Connector at the intersections of Fontaine Road and Cooper Lake Road. The safety improvements will include extension of the westbound left-turn lanes at both intersections. Project Duration: All work to be completed by July 31, 2026. Contractor must meet the current bid requirements of the Georgia Department of Transportation. Contractor and their subcontractors are required to be in compliance with the "Georgia Security and Immigration Compliance Act." Cobb County will affirmatively comply with Title VI of the Civil Rights Act of 1964 and 78 Stat. 252, 42 USC 2000d42 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, part 21 Nondiscrimination Act(s). Disadvantaged Business Enterprise (DBE) Participation and Small Business Participation in all DOT contracts is encouraged. The Cobb County Board of Commissioners reserves the right to reject all Bids and waive any formalities. Submit all submittals, questions, and work related documentation described in the ITS specifications to the Department.

Bid Results

Roads / Highways

$1,063,693.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
226
Active Projects
98
Bidding Soon
2,030
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2025

November 10, 2025

Project location map

Multiple Locations, Marietta, GA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.