BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 16, 2025 at 8:00 PM

Updated October 17, 2025

Site work for a water / sewer project in Norman, Oklahoma. Completed plans call for site work for a water / sewer project.

Sewer Lift Station Headworks Grinder Description: Rehabilitate Existing Comminutor. Work of the Project includes Replacement of Existing Comminutor, Misc. Valving, Piping, Equipment and Misc. Electrical and Controls as shown on the drawings and specified in the Specifications. The work covered in these CONTRACT DOCUMENTS generally consists of: 1. Replace existing comminutor w/ new grinder and appurtenances. 2. Replace existing and install new valves and associated appurtenances. 3. Cleanout existing list station wet pit. 4. Install electrical to connect new grinder to existing main control panel. Bid(5%), Performance(100%), Payment(100%), Maintenance(100%), Certified Check

Post-Bid

Water / Sewer

$400,000.00

Public - City

Site Work

10

21

4

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
73
Bidding Soon
876
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2025

November 14, 2025

Project location map

Multiple Locations, Norman, OK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.