Published October 17, 2025 at 8:00 PM

Updated October 18, 2025

Site work and paving for a mixed-use development in Aurora, Colorado. Completed plans call for site work for a water / sewer project; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The WORK of this project consists of rehabilitating 90-inch corrugated metal storm drains that run under S. Tower Road just north of E. Mansfield Avenue with a geopolymer lining. In addition, a portion of the storm drains that are not suitable for rehab will be removed and replaced by a single dual cell box culvert structure. This structure will discharge flows into the Summer Valley Ranch tributary. Work will also include extending the existing channel to the outlet structure and removing an existing Type R-5 inlet and replacing in kind. Reference Number 0000398683 The City of Aurora (Water Department) is seeking bids from qualified prime contractors for the Summer Valley Ranch Tributary at Tower Road drainage improvements project. During the design, it was discovered that the pipe on Summer Valley Ranch Tributary beneath Tower Road north of Mansfield Avenue had deteriorated much more than expected. The design team collected additional data and provided a more detailed rehabilitation analysis. Construction for Summer Valley Tributary at Tower Road includes: Mobilization, traffic control, dewatering, erosion and sediment control, demolition, reinforced concrete pipe, cast in place concrete, geopolymer lining, utility coordination, asphalt paving, concrete sidewalk, restoration and other miscellaneous items. PRE-QUALIFICATION Prime Contractors have been pre-qualified for this Invitation to Bid. Bids shall not be accepted from firms other than those pre-qualified firms on this solicitation. This advertisement is for the sole purpose of identifying this procurement action to potential subcontractors who may wish to participate through the selected prime contractor. Question Deadline 10/09/2025 at 2:00 PM MT Questions are submitted online No, Any questions must be submitted in writing by email to Heidi Ellis, Senior Procurement Agent at heellis@auroragov.org. Emailed questions shall contain the project name and number in the email subject line, and must be received no later than time Questions will be answered via addendum posted to online. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Each Bid shall be accompanied by an appropriate guarantee in the form of a Bid Bond made payable to the City of Aurora in an amount of not less than five percent (5%) of the amount of the Bid. In addition, the bid guarantee shall be accompanied in the same file as the bid. Questions are submitted online No, Any questions must be submitted in writing by email to Heidi Ellis, Senior Procurement Agent at heellis@auroragov.org. Emailed questions shall contain the project name and number in the email subject line, and must be received no later than time Questions will be answered via addendum posted to online. The Contract Documents require that all work be Substantially Complete by May 30, 2026, with Final Completion by June 30, 2026. Failure to complete the work as prescribed shall be considered as a Breach of Contract and subject to Liquidated Damages which are $1,500.00 per day. The estimated cost for this project is from $1,900,000.00 to $2,000,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$2,000,000.00

Public - City

Paving, Site Work

99

20

11

7

Subscribe For Documents

144 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
85
Bidding Soon
1,331
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2025

December 22, 2025

Project location map

Tower Rd, Aurora, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.