Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 25, 2025 at 7:00 PM

Updated November 26, 2025

Site work for a civil project in Madison, Wisconsin. Completed plans call for site work for a water / sewer project.

W4 System Improvements project includes, but is not limited to, the replacement of the W4 system pumping and straining equipment, and replacement of the chemical storage tanks and chemical pumps. The work also includes piping replacement, site work, electrical, instrumentation and controls, plumbing, and other ancillary work required to accomplish the modifications. Question Deadline 10/07/2025 All questions regarding the project shall be directed to Tyler Michlig, Project Engineer, Madison Metropolitan Sewerage District, tylermi@madsewer.org., All questions about the meaning or intent of the Contract Documents shall be submitted to the District in writing not less than seven (7) days prior to the date for opening of Bids

Award

Water / Sewer

$2,035,870.00

Public - City

Site Work

65

25

38

10

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
298
Active Projects
115
Bidding Soon
2,450
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed