BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 19, 2025 at 8:00 PM

Updated September 20, 2025

Site work, paving and outdoor lighting for a civil project in Madison, Wisconsin. Conceptual plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; and water / sewer project.

Solicitation Id: SW-02 I-39/90/94 modernization project including expanding interstate mainline, reconstructing interchanges, and reconstructing overpasses due to safety and operational concerns. The needs of the project include traffic demands, safety needs, bridge condition, pavement condition, and corridor resiliency. Preliminary and final design of improvements to one segment of the I-39/90/94 majors project (US 12/18 to Hanson Road). Design of I-39/90/94 from US 12/18 (MAD S Beltline) to Hanson Road in Dane County. Design includes modernization and expansion plans for I-39/90/94 based on the environmental impact statement and includes the reconstruction of system-to-system interchanges, standard interchanges, a half interchange, and overpasses. Deliverables include design from study to Plans, Specifications, and Estimates. Solicitation includes, but is not limited to, the completion of roadway plans, structure plans including noise walls, DSR, TMP, TPP, estimates, traffic staging, PI, geotechnical reports/borings, PDR, field survey, stormwater design, environmental documentation and permitting, agency coordination, signal/lighting plans, local official coordination, utility coordination, RR, and transparency services. Project duration shown is for the 1st contract (design of Cottage Grove Rd overpass); additional contracts may be awarded from this solicitation. Firms selected for this solicitation, prime/joint venture (P/JV), may not be selected as a P/JV for corridor continuity or program controls solicitations. Consultant firms hired by a municipality as a contracted municipal engineer may not compete for contracts that WisDOT is a party to that impact the municipality per FDM 8-5-3.4. As the project progresses, key staff will need to attend meetings 1 or 2 days a week in MAD office. DBE goal: DBE goal in $ 50000.00 Anticipated Project Start Date: 07/01/2026 Anticipated Project Completion Date: 11/01/2030 The Method of Contractor Selection Has Not Been Determined at This Time. WIDOT - RFP Engineering - Madison - Portage

Conceptual

Roads / Highways

$45,000,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
271
Active Projects
67
Bidding Soon
1,576
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.