BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 6, 2025 at 7:00 PM

Updated November 7, 2025

Renovation of a playground / park / athletic field in Madison, Wisconsin. Completed plans call for the renovation of a playground / park / athletic field.

The Division of Facilities Development, hereinafter termed DFD, hereby announces that it is advertising for bids from certified contractors for the above project. All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $100,000. All bids received from contractors who are not certified will be rejected. These changes take effect January 1, 2014. Contractor certification applications and instructions for completing the form may be obtained from the DOA Website. DFD Contractor Certification page: online. In general, the work consists of: Harrington Beach State Park: The single and double unit pit toilets located in the Family and Walk-To Campsites are to receive new epoxy flooring with a cove base, base tab repair and touch up paint. Hartman Creek State Park: The Main Office building demolition consists of exterior siding, soffits, windows and roofing. New exterior materials will consist of metal siding and soffits, aluminum-clad windows, and standing seam metal roof. Kohler Andrae State Park: The Shower Building located in the Family Campground will have its south CMU wall rebuilt. The south wall is experiencing structural failure and needs to be rebuilt with new CMU block and metal frames. Existing doors will be reused. Point Beach State Park: Area A-Park Shelter is to have its existing roofing removed and new asphalt roofing installed. Area B-Vault Toilet #110 is to have its existing roofing removed and new asphalt roofing installed. Area C-Pumphouse is to have its existing roofing removed and new wood shake roofing installed. This is a historic building and the new roofing must match the old roofing. Wood Storage is to have its existing roofing removed and new asphalt roofing installed. Site 10 Vault Toilet is to have its existing roofing removed and new asphalt roofing installed. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. Project Location: Harrington Beach State Park 531 County Highway D Belgium, WI 53004 Hartman Creek State Park N2480 Hartman Creek Rd. Waupaca, WI 54981 Kohler Andrae State Park 1020 Beach Park Lane Sheboygan, WI 53081 Point Beach State Park 9400 County Highway O Two Rivers, WI 54241

Bid Results

Playgrounds / Parks / Athletic Fields

$414,320.00

Public - State/Provincial

Renovation

21

13

6

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
403
Active Projects
228
Bidding Soon
1,776
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.