Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 12, 2025 at 7:00 PM
Updated November 13, 2025
Site work and paving for a bridge / tunnel in San Mateo, California. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
All bids shall be accompanied by a bid bond, cashier's check, or certified check made payable to the City of San Mateo in an amount not less than ten percent (10%) of the aggregate amount of the bid. Said amount or the proceeds of said bond shall be forfeited to the City if the bidder depositing same does not, within 8 working days after the bidder has received notice from the City of San Mateo that the contract has been awarded, sign and return the contract to the City and furnish the other items required under Section 3, "Contract Award and Execution," of the special provisions. Questions regarding the bid must be received a minimum of 5 business days before the date in item 3 below. The Payment Bond and the Performance Bond shall be in a sum equal to the contract price. If the Performance Bond provides for a one-year warranty a separate Maintenance Bond is not necessary. If the warranty period specified in the contract is for longer than one year a Maintenance Bond equal to 10% of the contract price is required. Bonds shall be duly executed by a responsible corporate surety, authorized to issue such bonds in the State of California and secured through an authorized agent with an office in California. Question Deadline 10/09/2025 This contract is subject to the Disadvantaged Business Enterprise (DBE) Program in accordance with Title 49 of the Code of Federal Regulations (CFR), Part 26 and the State of California, Department of Transportation DBE Program Plan. The Disadvantages Business Enterprise (DBE) goal for the project is 13%. Doc note: Any questions regarding the contract documents should be directed to Stephanie Piñon, Senior Engineer, at (650) 522-7300, or in writing at publicworks@cityofsanmateo.org. The right is reserved, as the interest of the City may require, to reject any or all bids, to waive any informality in bids, or in the case of a single bid being received to extend the acceptance date by up to thirty (30) days with notice. The City of San Mateo is a charter City and any contract entered into is subject to the provisions of the City of San Mateo Charter, which may supersede certain provisions of the Public Contract Code and other provision of state law.
Award
Bridges / Tunnels
$6,888,369.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 21, 2025
March 23, 2026
Bermuda Dr, San Mateo, CA
Related To This Project
San Mateo, CA
--
San Mateo, CA
Bid Date: Nov 20 2025
San Mateo, CA
--
San Mateo, CA
Bid Date: Oct 30 2025
San Mateo, CA
--
San Mateo, CA
Bid Date: Nov 26 2025
San Mateo, CA
Bid Date: Nov 06 2025
San Mateo, CA
Bid Date: Oct 07 2025
San Mateo, CA
--
San Mateo, CA
Bid Date: Oct 07 2025
San Mateo, CA
Bid Date: Oct 16 2025
San Mateo, CA
--
San Mateo, CA
Bid Date: Sep 25 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
