Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 20, 2025 at 8:00 PM
Updated October 21, 2025
Demolition, site work and renovation of a water / sewer project in Camas, Washington. Completed plans call for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.
**As of October 20, 2025 , this project has not yet been awarded. The project is expected to be awarded on December 1, 2025.** This Work consists of the construction of all components of Main Pump Station Improvements, including demolition of existing pump station components, pipelines and building HVAC systems, construction of new pump station components, modification of existing components, conduit and equipment for electrical services and controls, construction of building HVAC, restoration, erosion control, bypass pumping, traffic control, and other work, all in accordance with the Plans and these Specifications. All Bid Proposals shall be accompanied by a Bid Proposal deposit in cash, certified check, cashiers check, or surety bond in an amount equal to five percent (5%) of the amount of such Bid Proposal. For questions, please contact Rob Charles, PE, 360-817-7003 or RCharles@cityofcamas.us at the City of Camas. The City of Camas expressly reserves the right to reject any or all Proposals and to waive minor irregularities or informalities and to Award the Project to the lowest responsible bidder as it best serves the interests of the City. The work to be performed under these Specifications and accompanying Drawings consists of furnishing all permits, labor, materials, and equipment necessary for the construction of improvements at the Main Pump Station, including all electrical work, piping and mechanical work, heating and ventilation work, and all work incidental to or necessary for satisfactory completion of the work shown on the Drawings and described in the Specifications. The major components of the work are: 1. Demolition of existing electrical and control equipment, and replacement with new electrical and control equipment. 2. Demolition of existing heating and ventilation equipment, and replacement with new heating and ventilation equipment. 3. Demolition ofselect piping, and installation of new flow meter, valves, and piping. 4. Surface preparation and epoxy coating the existing pump station wetwell
Bid Results
Water / Sewer
$898,122.00
Public - City
Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 14, 2025
April 15, 2026
SE 3rd Ave, Camas, WA
Related To This Project
Camas, WA
--
Camas, WA
Bid Date: Nov 06 2025
Camas, WA
Bid Date: Nov 06 2025
Camas, WA
Bid Date: Dec 03 2025
Camas, WA
Bid Date: Dec 16 2025
Camas, WA
Bid Date: Dec 18 2025
Camas, WA
--
Camas, WA
--
Camas, WA
Bid Date: Jul 03 2025
Camas, WA
Bid Date: Jun 26 2025
Camas, WA
Bid Date: Jun 12 2025
Camas, WA
Bid Date: May 21 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
