Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 6, 2025 at 7:00 PM
Updated November 7, 2025
Site work for a civil project in Des Moines, Iowa. Completed plans call for site work for a water / sewer project.
A. Provide all labor, materials, and equipment necessary for completing the 2025 - FWTP Flood Improvements - Retaining Wall project. B. This project involves replacing an existing block retaining wall with a steel sheet pile wall. Work will begin with comprehensive site preparation and coordination with utility providers. Initial activities include removing existing infrastructure such as fencing, the block retaining wall, levee topsoil, and levee fill as necessary to allow for construction access and installation. New fencing must be installed prior to any other work occurring. C. Following site clearance, a steel sheet pile wall will be installed, complete with structural caps and concrete facades to enhance durability and appearance. Vibration monitoring will be conducted throughout sheet pile installation to ensure safety and to minimize impacts to surrounding infrastructure. D. Behind the new wall, a seepage collection system will be constructed using fine and coarse filter aggregates to support proper drainage and seepage control. Subsurface stabilization will include sealing the force main carrier pipe and performing injection grouting around it. E. Aluminum railing will be installed on top of the new wall for safety. Environmental protection measures such as erosion control, inlet protection, and a concrete washout area will be implemented throughout the project. F. The levee will then be backfilled with compacted fill material, and salvaged topsoil will be used to redress the surface. Final site restoration will include seeding and landscaping to return the area to a stable, functional, and visually acceptable condition. The base bid does not include curb, gutter, and paving. G. Bid Alternate 1 includes the lump sum work for completing the paving as site restoration for the project. H. Bid Alternate 2 includes a unit price per cubic yard for temporary levee fill and removal in the event of flood protection. Est. Completion Date: June 30, 2026
Award
Water / Sewer
$793,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 6, 2025
December 5, 2025
2201 George Flagg Pkwy, Des Moines, IA
Related To This Project
Des Moines, IA
Bid Date: Oct 16 2025
Des Moines, IA
--
Des Moines, IA
Bid Date: Nov 04 2025
Des Moines, IA
Bid Date: Oct 31 2025
Des Moines, IA
Bid Date: Oct 28 2025
Des Moines, IA
Bid Date: Oct 24 2025
Des Moines, IA
Bid Date: Oct 07 2025
Des Moines, IA
Bid Date: Oct 01 2025
Des Moines, IA
--
Des Moines, IA
Bid Date: Oct 01 2025
Des Moines, IA
Bid Date: Oct 21 2025
Des Moines, IA
Bid Date: Oct 08 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
