BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 6, 2025 at 7:00 PM

Updated November 7, 2025

Site work for a civil project in Des Moines, Iowa. Completed plans call for site work for a water / sewer project.

A. Provide all labor, materials, and equipment necessary for completing the 2025 - FWTP Flood Improvements - Retaining Wall project. B. This project involves replacing an existing block retaining wall with a steel sheet pile wall. Work will begin with comprehensive site preparation and coordination with utility providers. Initial activities include removing existing infrastructure such as fencing, the block retaining wall, levee topsoil, and levee fill as necessary to allow for construction access and installation. New fencing must be installed prior to any other work occurring. C. Following site clearance, a steel sheet pile wall will be installed, complete with structural caps and concrete facades to enhance durability and appearance. Vibration monitoring will be conducted throughout sheet pile installation to ensure safety and to minimize impacts to surrounding infrastructure. D. Behind the new wall, a seepage collection system will be constructed using fine and coarse filter aggregates to support proper drainage and seepage control. Subsurface stabilization will include sealing the force main carrier pipe and performing injection grouting around it. E. Aluminum railing will be installed on top of the new wall for safety. Environmental protection measures such as erosion control, inlet protection, and a concrete washout area will be implemented throughout the project. F. The levee will then be backfilled with compacted fill material, and salvaged topsoil will be used to redress the surface. Final site restoration will include seeding and landscaping to return the area to a stable, functional, and visually acceptable condition. The base bid does not include curb, gutter, and paving. G. Bid Alternate 1 includes the lump sum work for completing the paving as site restoration for the project. H. Bid Alternate 2 includes a unit price per cubic yard for temporary levee fill and removal in the event of flood protection. Est. Completion Date: June 30, 2026

Award

Water / Sewer

$793,000.00

Public - City

Site Work

16

28

2

6

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
101
Bidding Soon
1,117
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2025

December 5, 2025

Project location map

2201 George Flagg Pkwy, Des Moines, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.