BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 29, 2026 at 8:00 PM

Updated May 20, 2026

Site work, new construction and renovation of a mixed-use development in Helena, Montana. Completed plans call for the construction of a 241,719-square-foot educational facility; for site work for a educational facility; and for the renovation of a 36,415-square-foot educational facility.

Plans call for the construction of a new ground up school of 241,719 square feet and renovations to the existing school totaling 36,415 square feet. NOTICE OF REQUEST FOR QUALIFICATIONS & PROPOSALS (RFQ/RFP) FOR HELENA HIGH SCHOOL STEEL SUPPLY/ERECTION SUBCONTRACTORS Dick Anderson Construction (GC\CM) seeks to qualify and select Steel Supply/Erection Subcontractors for the Preconstruction and Construction phases of the Helena High School Project. This is a Montana Prevailing Wage Rate project. The selected Subcontractors will be expected to provide: 1. FOR THE PRECONSTRUCTION PHASE: Input to the construction team on materials & methods of construction, constructability, scheduling and cost estimating culminating in a Guaranteed Maximum Price for their portion of the Work at a time to be determined. Also provide input for Bid Packages to allow material suppliers an equal opportunity for bidding the material portions of the Work. 2. FOR THE CONSTRUCTION PHASE: Provide all necessary materials, tools, labor and equipment for construction portions of the Project. Subcontractor must be able to provide Payment and Performance bonds for their portion of the work. This Project is being delivered on a Fast Track schedule. Time is of the essence, as the project shall be fully complete and ready for occupancy at the start of the 2028 school year. Helena School District has selected A&E/SMA as the Design Firm for the project. The project consists of: NEW SCHOOL TOTALING 241,719 SF RENOVATIONS TO EXISTING SCHOOL TOTALING 36,415 SF Subcontractors seeking a position on the team must submit documentation in the form required by the RFQ/RFP. The RFQ/RFP can be obtained by contacting: Tim Tholt Dick Anderson Construction 3424 E US HWY 12 Helena, MT 59601 ttholt@daconstruction.com (406) 579-4006 Estimate = total construction cost estimate.

Award

Educational

$240,000,000.00

Public - City

New Construction, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
13
Bidding Soon
251
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2026

August 3, 2026

Project location map

1300 Billings Ave, Helena, MT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.