BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 22, 2025 at 8:00 PM

Updated September 23, 2025

Demolition, site work, paving, new construction and renovation of a mixed-use development in Helena, Montana. Design plans call for the construction of a educational facility.

Plans call for significant renovations to Capital High School to address critical infrastructure needs including CTE spaces are disconnected and undersized. The school lacks a commons and accessible auditorium for student collaborate on and community events. This project is part of the school district’s bond that passed. As of September 19, 2025, it is currently unknown if an architect, construction manager, and general contractor have been contracted with the school district. Further details regarding design and construction timelines have not been released.

Design

Educational

$59,500,000.00

Public - City

Demolition, New Construction, Paving, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
18
Bidding Soon
143
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 13, 2026

Project location map

100 Valley Dr, Helena, MT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.