Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 2, 2025 at 7:00 PM
Updated December 3, 2025
Demolition, site work and paving for a mixed-use development in Birmingham, Alabama. Completed plans call for the demolition of a 3,400-square-foot transportation facility; for site work for a transportation facility; and for paving for a transportation facility.
**As of December 02, 2025, the project was awarded to CJ Ventures, with an awarded amount of $55,312.50** Bid security shall be submitted with each bid in the amount of five (5) percent of the bid amount in the form of a Bid Guarantee. No bids may be withdrawn for a period of ninety (90) days after opening of bids. Question Deadline 10/03/2025 Bidder Questions: Submit written questions to be addressed at Prebid meeting minimum of two (2) business days prior to meeting to: Owners Representative: Ed Seoane VP of Purchasing, Birmingham Airport Authority 5900 Messer Airport Highway Birmingham, AL 35212 P: 205.599.0703 M: 205.332.5702 eseoane@flybhm.com Event pre-bid note: A walk-through of the site will follow immediately after the conclusion of the Conference will be conducted, if requested by meeting participants. BAA reserves the right to reject any and all bids and to waive informalities and irregularities. Work shall include the complete demolition and removal of the former Dollar RentA-Car building. The building is located on a paved parcel, outside of the airfield but adjacent to Taxiway B and Runway 18-36. The structure is a single-story, metal-framed building with an approximate footprint of 3,400 square feet, consisting of three primary areas: A front office and customer service area, including two offices and storage areas A service garage (repair bay) used for oil changes with a floor mounted hydraulic lift with overhead doors A car wash bay at the rear with a floor-mounted wash rack Demolition includes the removal of the structure and associated materials as well as capping utilities associated with electrical, natural gas, water, sewer, and communications. Final restoration of the site shall include grading and paving of the former building footprint with Alabama Department of Transportation (ALDOT) asphalt mix to create a continuous paved lot surface.
Award
Transportation Terminals
$55,313.00
Public - City
Demolition, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 17, 2025
November 17, 2025
5600 Airline Dr, Birmingham, AL
Related To This Project
Birmingham, AL
--
Birmingham, AL
Bid Date: Oct 28 2025
Birmingham, AL
Bid Date: Oct 29 2025
Birmingham, AL
Bid Date: Nov 06 2025
Birmingham, AL
Bid Date: Oct 14 2025
Birmingham, AL
Bid Date: Oct 28 2025
Birmingham, AL
Bid Date: Oct 16 2025
Birmingham, AL
Bid Date: Jan 29 2026
Birmingham, AL
Bid Date: Sep 30 2025
Birmingham, AL
--
Birmingham, AL
Bid Date: Oct 22 2025
Birmingham, AL
Bid Date: Oct 10 2025
Birmingham, AL
Bid Date: Sep 14 2025
Birmingham, AL
Bid Date: Sep 24 2025
Birmingham, AL
Bid Date: Oct 02 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
