Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 23, 2025 at 8:00 PM
Updated September 26, 2025
Site work and paving for a road / highway in Spokane Valley, Washington. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
Project Description The work to be performed by the consultant consists of preparing final design for the improvements on Barker Road between I-90 and Appleway Avenue. The proposed improvements include reconstructing Barker Road to four/five lane roadway with multi-modal facilities, intersection improvements (roundabouts or signals) at Broadway Avenue and Appleway Avenue, modifications to the 1-90 eastbound ramp roundabout and stormwater improvements. This agreement has a 16% Disadvantaged. Business Enterprise (DBE) goal. The City of Spokane Valley (City) solicits interest from consulting firms with expertise and experience in Civil Engineering Design. This agreement will be for approximately two years in duration with the option for the City to extend it for additional time and money at the City's discretion and as additional funds become available. Final design services may include: 1) Additional Surveying (if needed) 2) Traffic analysis 3) Urban roadway design 4) Environmental documentation and preparation of permit applications 5) Pavement, roundabout, street lighting, and stormwater design 6) Geotechnical recommendations 7) Preparation of plans, specifications, and estimates for construction bid documents 8) Accessibility design and analysis 9) Constructability analysis 10) Public Involvement 11) Determination of R/W needs and R/W plan preparation. 12) R/W negotiations and R/W acquisitions. 13) Bid support The City of Spokane Valley reserves the right to retain the services of the successful firms for any subsequent phases (CN) associated with this project. Evaluation Criteria Each consultant will be evaluated and ranked based on the following criteria: 1. Qualifications of project team and key team members 2. Project team experience on similar projects 3. Approach to schedule 4. Approach to quality control 5. Approach to meet the DBE goal
Conceptual
Roads / Highways
$400,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 13, 2026
Barker Rd, Spokane Valley, WA
Related To This Project
Spokane Valley, WA
Bid Date: Oct 20 2025
Spokane Valley, WA
--
Spokane Valley, WA
Bid Date: Nov 17 2025
Spokane Valley, WA
Bid Date: Dec 17 2025
Spokane Valley, WA
Bid Date: Dec 29 2025
Spokane Valley, WA
Bid Date: Dec 16 2025
Spokane Valley, WA
Bid Date: Dec 03 2025
Spokane Valley, WA
--
Spokane Valley, WA
--
Spokane Valley, WA
Bid Date: Aug 08 2025
Spokane Valley, WA
Bid Date: Oct 27 2021
Spokane Valley, WA
Bid Date: Jul 11 2025
Spokane Valley, WA
Bid Date: Jul 17 2025
Spokane Valley, WA
--
Spokane Valley, WA
Bid Date: Aug 08 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
