BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 19, 2025 at 7:00 PM

Updated November 20, 2025

Site work and paving for a mixed-use development in Agoura Hills, California. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

SCOPE OF WORK. The Project includes, without limitation, furnishing all necessary labor, materials, equipment, and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. Morrison Park is located at the intersection of Thousand Oaks Boulevard and Forest Cove Lane in the City of Agoura Hills. The Morrison Park ADA Path of Travel Improvements Project is funded in part by the U.S. Department of Housing and Urban Development through the Community Development Block Grant (CDBG) Program. The Project includes the replacement of inclusive playground equipment, removal of wood chips, installation of pour-in-place rubber flooring surface, concrete work, minor drainage work, removing and replacing benches, minor rehabilitation of the existing parking lot and various site ADA accessibility upgrades. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the City Engineer Request For Information no later than 3:00 p.m. on October 2, 2025. BONDS. Each Bid must be accompanied by a cash deposit, cashier's check, certified check, or Bidder's Bond issued by a Surety insurer, made payable to the City and in an amount not less than ten percent (10%) of the total Bid submitted. Personal or company checks are not acceptable. LIQUIDATED DAMAGES. All Work shall be completed within 55 Working Days following the date specified in the written Notice to Proceed from the City. There will be a $600 assessment for each Day that Work remains incomplete beyond the time specified for the completion of the Work in the Contract Documents. Question Deadline 10/02/2025 at 3:00 PM PT Request For Information through Online If you discover any error, omission, ambiguity or conflict in the Plans or Specifications and wish to have a clarification, please submit your Request For Information (RFI) through www.planetbids.com

Award

Playgrounds / Parks / Athletic Fields

$346,284.00

Public - City

Paving, Site Work

28

13

5

9

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
412
Active Projects
198
Bidding Soon
3,103
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2025

November 17, 2025

Project location map

29909 Forest Cove Ln, Agoura Hills, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.