BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2025 at 7:00 PM

Updated December 3, 2025

Site work for a water / sewer project in Chicago Heights, Illinois. Completed plans call for site work for a water / sewer project.

**As of December 2, 2025, the project was awarded to Professional Meters, Inc. (PMI), with an awarded amount of $929,827.98** This project generally consists of the installation of new potable water meters; and all other related appurtenances and accessories necessary to complete the Work. certified check/bank draft drawn on a solvent bank, payable without condition to the City of Chicago Heights, or a bid bond in an amount not less than ten percent (10%) of the bid shall be submitted with each proposal as a guarantee that, if the proposal is accepted, a contract will be entered into and the performance of the contract is properly secured. A Performance Bond and Payment Bond, each in a sum equal to one hundred percent (100%) of the amount of the bid with sureties to be approved by the Mayor and City Council, must be furnished by the successful bidder. All bids or proposals shall contain an offer to furnish bonds upon acceptance of such bid or proposal. The right is reserved to reject any or all proposals, to waive technicalities, to postpone the bid opening, or to advertise for new proposals, if in the judgment of the Mayor and City Council their best interests will be promoted thereby. Question Deadline 10/03/2025 Direct questions to Mr. John P. Caruso, at (847) 823-0500. Questions regarding documents, discrepancies, omissions, or intent of the Specifications or Drawings shall be submitted in writing to Owner at least ten (10) days prior to opening of Bids to provide time for issuing and forwarding an Addendum A. General. The Work to be performed consists of furnishing labor, materials, equipment, and supervision as required by the Contract Documents for the Water Meter Replacement as required and as herein specified, including any and all accessories associated with the installation. The Work to be performed is generally summarized to include but not be limited to the following. B. The project consists of the installation of new potable water meters. C. The City will supply the meters and MXU. Contractor will remove existing meter and return to the City. Contractor shall install new meters and MXU.

Award

Water / Sewer

$929,828.00

Public - City

Site Work

96

13

6

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
465
Active Projects
269
Bidding Soon
3,370
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2025

November 14, 2025

Project location map

Multiple Locations, Chicago Heights, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.