Published November 19, 2025 at 7:00 PM

Updated November 20, 2025

Site work and paving for a civil project in West Palm Beach, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

**As of November 05, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The City of West Palm Beach is accepting bids from experienced, qualified and responsible contractors to construct storm drainage and roadway improvements as shown in the construction drawings and described in the technical specifications for the Project. Construction Drawings and Technical Specifications: Construction Drawings prepared by City of West Palm Beach Public Utilities Department, 48 th Street Utilities Replacement (Pinewood Avenue to Broadway Avenue Project, WPB Project No. 12060833, dated September 2025, Exhibit A. Technical Specifications prepared by City of West Palm Beach Public Utilities Department, 48th Street Utilities Replacements (Pinewood Avenue to Broadway Avenue), dated August 2025, Exhibit B. Project Background: The existing stormwater pipe is located in the eastbound lane of 48 th Street. The 48 inch stormwater pipe is approximately 12-14 feet deep and was previously cured-in-place-pipe (CIPP) lined. A pipe condition assessment performed by the City found that the CIPP liner in the east half of the block is buckling and has a potential risk of failure. The Project calls for the replacement of the existing 48-inch stormwater pipe from 640 48th Street to the west right-of-way of Broadway Avenue for approximately 510 linear feet, please refer to the limits outlined in red in Figure 2. The existing 8-inch vitrified clay pipe (VCP) sanitary sewer (main and laterals CIPP lined) is located near the roadway centerline at approximately 8 feet deep and is approximately 10 feet north of the 48-inch stormwater pipe.The water main is in the westbound lane. Available City records information indicates that the 6 inch cast iron pipe (CIP) water main was installed in the 1920s. All water services are copper. The City's records show there was no work orders for pipe repairs on the existing water main. Per a geotechnical engineering report performed in November 2019, the water table was found at a depth of 6.2 feet and 7.9 feet below ground surface in Borings B-1 and B-2 No interpretation or changes to the meaning of the Invitation to Bid will be made to any firm orally, except by written addendum. All questions that change the scope of work or alter the contents of these documents will be answered via addendum. The addenda will form an integral part of the bid and will modify and become part of the ITB document. Question Deadline 10/10/2025

Award

Water / Sewer

$598,300.00

Public - City

Paving, Site Work

18

14

2

5

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
72
Bidding Soon
1,904
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2025

December 22, 2025

Project location map

48th St, West Palm Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.