BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 8, 2025 at 8:00 PM

Updated October 9, 2025

Site work for a swimming pool in Peoria, Illinois. Completed plans call for site work for a 7,000-square-foot swimming pool.

As of September 29, 2025, this project has not yet been awarded. A timeline for award has not yet been established. The Peoria Park District is soliciting written quotes for the painting of Gwynn Family Aquatic Center Pool per description below located at Gwynn Park, 809 W. John Gwynn Jr. Ave., Peoria, IL. A. General Information: Gwynn Pool was last painted in 2023. Contractor shall power wash the existing pool basin with oscillating power nozzle with 3500 to 4000 PSI to remove loose paint, prep and patch the surface and joints, and seal and paint the surface. Owner will provide the paint and sealer for the project. B. General Scope of Work for Painting Contractor: The work will begin with power washing of the pool basin. The contractor shall power wash the pool using an oscillating power nozzle 3500 4000 PSI to remove loose paint. Contractor is responsible for sanding and feathering-out rough edges after loose paint is removed. Contractor is responsible for final surface preparation to ensure proper adhesion of patching materials and coatings. Following surface cleaning, the contractor shall perform concrete patching as needed to obtain a smooth paint-able surface. Once the patching is completed and cured as required by manufacturers specifications, the contractor shall proceed with the removal and installation of new caulk in all designated joints, totaling approximately 85 linear feet. After surface repairs and joint treatments are complete, the contractor shall proceed with sealing the pool surfaces. Contractor shall seal the pool surfaces using Amerlock Sealer according to manufacturers written instructions. Upon completion of the sealing process and in accordance with drying/ curing times, Contractor shall proceed with painting of all pool surfaces. Total surface area of the pool is approx. 7000 sq. ft. Contractor is responsible for field verifying. Contractors work shall be guaranteed for one year. Please note that the prevailing rate of wage including benefits for the Peoria area shall be paid for each craft or type of worker needed to execute this project or perform this work as required by the State of Illinois Department of Labor. Please contact Yoginee Nawale at (309) 686-3386 if you have any questions or would like to visit the site. Schedule: Work must be completed by May 15, 2026.

Award

Swimming Pools

$23,840.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
73
Bidding Soon
1,130
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2025

October 24, 2025

Project location map

809 W John H Gwynn Jr Ave, Peoria, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.