Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 11, 2026 at 8:00 PM
Updated June 12, 2026
Renovation of a military facility in Minot AFB, North Dakota. Completed plans call for the renovation of a 1,776-square-foot military facility.
Provide flooring installation, repair, and replacement services, including all labor, materials, tools, equipment, and supervision necessary to complete construction tasks under a Multiple Award Construction Contract. Work will be performed on an as-needed basis through firm-fixed-price task orders issued under an Indefinite-Delivery, Indefinite-Quantity contract, supporting a range of flooring-related construction requirements. Services must comply with all applicable specifications, codes, and standards outlined in the Statement of Work and associated contract documents. Questions: All questions regarding this solicitation must be submitted in writing to the Contracting Officer at 5CONS.PKAC.FlooringMACC@us.af.mil no later than Tuesday, May 26, 2026, 1:00 p.m. CDT. This document provides detailed specifications for the flooring project named above. Please read the following instructions carefully to ensure a complete understanding of the scope of work. Scope of Work: Remove and replace existing carpet tiles with new ones in three rooms and one hallway located on the second floor of Building 475 (the Pride Building). This project specifically includes Rooms 251, 258, and 258C, as well as the hallway in front of Room 251. Room (Number/Location/Description) BLDG 475 2 nd floor Estimated Square Footage Room 251 432.5 sq ft Hallway 612 sq ft Room 258 300 sq ft Room 258C 431.84 sq ft Add additional rows as needed for requirements. Contractor Responsibilities: a. Verify Square Footage: It is the responsibility of the contractor to verify the actual square footage upon site inspectionb. Adhere to Material Specifications: The specified materials are crucial to maintaining a cohesive aesthetic throughout the facility. Please ensure that the correct flooring materials are used in each respective room.
Sub-Bidding
Military
$4,000,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 6, 2026
August 5, 2026
Multiple Locations, Minot AFB, ND
Related To This Project
Minot AFB, ND
Bid Date: Oct 21 2025
Minot AFB, ND
Bid Date: Jan 10 2026
Minot AFB, ND
--
Minot AFB, ND
Bid Date: Feb 27 2026
Minot AFB, ND
Bid Date: Feb 10 2026
Minot AFB, ND
Bid Date: Feb 17 2026
Minot AFB, ND
--
Minot AFB, ND
Bid Date: May 11 2026
Minot AFB, ND
Bid Date: May 08 2025
Minot AFB, ND
Bid Date: Apr 10 2025
Minot AFB, ND
--
Minot AFB, ND
--
Minot AFB, ND
Bid Date: Dec 11 2024
Minot AFB, ND
Bid Date: Oct 28 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
