Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 25, 2025 at 7:00 PM
Updated November 26, 2025
Demolition, site work, paving and new construction of a civil project in Falls, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.
The project involves the replacement of the existing bridge carrying S.R. 0092 over Fitch Creek. The project is located in Falls Township (Center Moreland Quadrangle; South 5.9 inches and West 0.35 inches, Latitude 41 28' 03.91" and Longitude -75 52' 38.89"). The structure is skewed 45 (0 to flow). It has a clear span of 12'-0" and the out-to-out width along flow is 35'-7-13/16". The waterway opening is approximately 76.17 ft2, with minimum vertical underclearance is 8'-0". The new structure will be a 9'-0" x 14'-0" single cell, precast box culvert built on the existing alignment with a 45 skew (0 to flow). The out-to-out width along flow will be 63'-0". The culvert will be depressed 1'-0" allowing the formation of a natural stream bed and provide a minimal vertical underclearance of 8'-0". The proposed waterway opening is approximately 112 ft2. The roadway will undergo full depth reconstruction and be widened to accommodate 2-12' lanes with 2-8' shoulders, which will taper to meet the existing roadway template. New guiderail will be installed along the length of the new construction. No drainage structures are required, all stormwater runoff will sheet flow off the road to adjacent swales and Fitch Creek. A 2-lane temporary roadway will be constructed on the downstream side of the existing structure to maintain traffic during construction. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight NHS DBE: 9% Structure Work: 42.00% Let Type: Scheduled Pre-bid Meeting: None Anticipated Ntp: 12/22/2025 Wage Rates: Yes Required Completion: 12/09/2026 Prequalification Requirement: Yes State Type of Work: Bridge Replacement WADOT - SR 92 over Fitch Creek *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Bridges / Tunnels
$1,877,231.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 6, 2025
December 22, 2025
PA-92, Falls, PA
Related To This Project
Falls, PA
Bid Date: Aug 06 2025
Falls, PA
Bid Date: Sep 14 2023
Falls, PA
Bid Date: Sep 06 2023
Falls, PA
Bid Date: Sep 06 2023
Falls, PA
Bid Date: Jun 09 2022
Falls, PA
Bid Date: Apr 13 2022
Falls, PA
--
Dyberry Township, PA
--
Honesdale, PA
--
Salem Township, PA
Bid Date: Dec 04 2025
Sugarloaf, PA
--
Whitehall, PA
Bid Date: Dec 11 2025
Mountain Top, PA
--
Mountain Top, PA
--
South Abington Township, PA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
