Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 16, 2026 at 8:00 PM

Updated October 21, 2026

Demolition, site work, paving and new construction of a civil project in Sugarloaf, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

The project involves replacing the existing 3 span structures carrying SR 0080 EB and WB over SR 0093, along with approach roadway and stormwater management improvements. The project also includes the realignment of the SR 0080 WB to SR 0093 ramp (Ramp C) with signalization of the Ramp C/SR 0093 intersection. Details of the SR 0080 EB replacement structure include, a 2 span, 221-6 continuous span P/S bulb tee beam structure on integral abutments. Details of the SR 0080 WB replacement structure include, a 2 span, 140-0 1/8 continuous span P/S bulb tee beam structure on abutments with spread footings. The structures will have 2 12 lanes, a 15 ramp lane, 8 left shoulder, 12-6 right shoulder (EB), and 12-4 right shoulder (WB). The project also includes replacing an ITS pole. The project will be staged to maintain two lanes of traffic on SR 0080 except for short term overnight lane closures. SR 0093 will have detours at times. The work also includes other miscellaneous construction, as indicated on the approved drawings included in the bid package for State Route 0080, Section 353, in Luzerne County, Sugarloaf Township from a point approximately 0.28 miles west of the bridges at segment 2555 offset 0688 (WB) to a point approximately 0.30 miles east of the bridges at segment 2561 offset 1510 (WB). Project Cost Range: $25,000,000.00 - $29,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 0.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Replacement Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PADOT - I-80 EB/WB Over SR 93 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Roads / Highways

$30,000,000.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
516
Active Projects
205
Bidding Soon
2,833
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2026

December 21, 2026

Project location map

I-80, Sugarloaf, PA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed