BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2025 at 7:00 PM

Updated December 5, 2025

Site work and paving for a mixed-use development in Richland, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project is the Roadway improvements on PA 756 from T-464 (Alvin Street) to T-737 (Industrial Park Road) Richland Township, Cambria County. The project is in a congested area and will improve intersection safety by improving sight distance, adding left turn lanes, improving driver awareness, traffic pattern adjustments, and updating/coordinating traffic signals that are nearing the end of their life expectancy throughout the corridor. In addition to improving intersections, the project will decrease lane departure crashes by relocating utility poles out of the path of vehicular traffic and providing wider shoulders and curbed sidewalks. Pedestrian accommodations at the existing signalized intersections will be updated to current ADA compliant standards. The sidewalks will create a safe refuge for pedestrians and the widened shoulders along with the inclusion of bicycle safe grates will enhance bicyclists' comfort and safety along the corridor. Signal work at the intersection of T-745 (Eisenhower Boulevard) and T-312 (Theatre Drive) is included with the project as indicated on the approved drawings included in the bid package for State Route 0756, Sections 010/013, in Cambria County Richland Township From Approximately Segment 0080 Offset 0300 to Segment 0150 Offset 0588. Project Cost Range: $7,500,000.00 - $9,999,999.99 Federal Project Status: PENNDOT Oversight Non-NHS DBE: 0% Structure Work: 2.00% Pre-bid Meeting: None Anticipated Ntp: 01/20/2026 Wage Rates: Yes Required Completion: 10/01/2027 Prequalification Requirement: Yes State Type of Work: Resurfacing/overlays Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PADOT - PA 756 - Alvin St to Industrial Park Rd *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Roads / Highways

$10,000,000.00

Public - State/Provincial

Paving, Site Work

322

13

33

4

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
75
Bidding Soon
1,490
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2025

January 20, 2026

Project location map

PA-756, Richland, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.