Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 25, 2026 at 8:00 PM

Updated October 1, 2026

Site work, new construction and renovation of a bridge / tunnel in Philadelphia, Pennsylvania. Completed plans call for the construction of a bridge / tunnel; and for the renovation of a bridge / tunnel.

TIMELINE: Phased construction began January 2026. Under Phases 1 and 2, the main 5,183-foot, double-decked I-95 Girard Point Bridge and nine approach structures between Enterprise Avenue and Broad Street (Route 611) will be repaired. Improvements include: Rehabilitating the bridge deck, including the application of a Latex Modified Concrete (LMC) overlay, and improving the decks’ expansion joints. Replacing the bridge parapets (barriers). Rehabilitating and painting select areas of steel superstructure. Rehabilitating substructure concrete. Replacing and improving the bridge’s lighting and drainage systems. Installing protection and scour remediation for the main Girard Point Bridge pier in the Schuylkill River. Upgrading Intelligent Transportation Systems (ITS) on I-95. Ten additional approach structures will be repaired under Phase 3 of the project, which is expected to start at the completion of Phase 2. Phase 4, not yet scheduled, will repaint the main bridge. The entire project is expected to finish in early 2031. South State Inc. of Bridgeton, NJ, is the general contractor on Phases 1 and 2. The project is financed with 90 percent federal and 10 percent state funds and is part of PennDOT’s Bridge Preservation Program to ensure the structural integrity and rideability of Pennsylvania’s bridges. Girard Point Bridge Rehabilitation, Phases 1 & 2 (Design Activities: County: Philadelphia SR : 4037 WADOT -Bridge Rehabilitation - SR - 95

Under Construction

Bridges / Tunnels

$261,500,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,083
Active Projects
451
Bidding Soon
5,958
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed